Installation & Oper
ating Ins
tructions
Wiring Centre Box
Model: TRT049N
Страница 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s Wiring Centre Box Model TRT049N...
Страница 2: ...r the circuit breaker turned off It is recommended that a qualified electrician is consulted or used for the installation of this wiring centre box and installed in accordance with the current IEE wir...
Страница 3: ...be used if appropriate 4 5 Pass the 230V 50Hz mains supply and load cables thought the cable entry point s and prepare for termination Allow sufficient excess cable to wire up the unit but not too muc...
Страница 4: ...Thermostat Model TRT044 Boiler Pump Optional Frost Stat Model TRT031N Programmer Models TRT034N TRT036N HW OFF HW ON CH ON CH OFF HWS NO HWC NC A C Mains in 5 Amp fuse E E E E L N N E E 11 11 12 E 10...
Страница 5: ...Stat Model TRT031N Programmer Models TRT034N TRT036N HW OFF HW ON CH ON CH OFF HWS NO HWC NC A C Mains in 5 Amp fuse E E E E L N N E E 11 8 11 12 E 10 9 4 6 7 N N E 13 L N N E E N L 1 2 3 4 N L SL Mot...
Страница 6: ...e agreed by Timeguard the customer is responsible for all shipping postage charges outside of the UK All shipping costs are to be paid in advance before a replacement is sent out Zerofour February 201...