4 Preparation
MIRUS Controller, SW 2.03.02, Additional Information Master (en-GB)
4-5
4.4 Starting MIRUS Controller
Comment:
To avoid interruption in start-up, ensure
•
connected AC (refer to Chapter 4.1 for more information).
•
filled internal reservoir (refer to Chapter 4.5 for more information).
•
MIRUS Reflector is placed in Park Bay (refer to Chapter 4.3
for more information).
1. Press Confirm button to start MIRUS
Controller.
2. MIRUS Controller is starting. The start-up
sound is heard. Alarm lights (left and right
on top of the display) flash in sequence
red, yellow and green for visual control.
3. During Power up test the Confirm button
and the alarm lights will flash in red for
approx. 3 seconds. At the same time the
panic alarm sound is tested.
Содержание Mirus MC DES
Страница 1: ...Additional Information MIRUSTM Controller Software version 2 03 02 Hardware version 2 n...
Страница 28: ...1 Introduction 1 22 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 48: ...3 General description 3 8 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 78: ...5 Operation 5 18 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 92: ...6 Cleaning and maintenance 6 14 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 118: ...7 Alarms and messages 7 26 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...