WH-C
.
2
.
2. UNPACKING AND INSTALLATION
Take all scale parts out of the carton and put them on a flat and hard surface. Follow below
procedures to fulfill the installation.
1. Place the cable (4) through the pillar (3).
2. Insert the pillar (3) into the tube support
(6).
3. Put the indicator bracket on the pillar
bracket.
4. Insert the 2 screws (2) through the holes
on the pillar bracket, tighten with nuts (18) and
flat washers (17), secure the bracket of pillar
to the indicator bracket (1),
5. Make sure the screws are securely
tightened.
6. Plug the connectors of indicator cable and load cell
cable from base together.
7. Rotate the pillar to position the indicator (1) in the
direction desired, and then tighten the 2 screws (5) into
the fixing tube (6).