ASSEMBLY
Assembly Section 2-24
FILLING HYDRAULIC RESERVOIR
Refer to the Maintenance Section for filling specifications and hydraulic oil requirements.
NOTE: Starting or running your Tiger mower before filling reservoir will cause
serious damage to the hydraulic pump.
(ASM-C-0004hydro resrv)
INSTALLING O-RING FITTINGS
Installing straight, 45º and 90º O-rings requires that the O-ring and washer be up against the
swivel body. Insert the swivel and turn in until the swivel is pointed in the desired direction and O-
ring contact is made. Hold swivel in set direction with a wrench and turn the O-ring nut away
from the swivel body and carefully tighten.
(ASM-C-0056)
INSTALLING NATIONAL PIPE FITTINGS
Whenever installing a pipe fitting, wrap the threads clockwise (looking at the end) with teflon
tape. In this way, the tape will be tightened when installed. NOTE: It is not necessary to tape O-
ring fittings, or those installed in swivels.
(ASM-C-0088)
PREFORMED TUBE INSTALLATION
Lay booms on floor so that the side with the clamp plates is up. Locate all tube clamps and
install them loosely onto the clamp plates.
Arrange the tubes and hoses as outlined in the Common Parts Section. Install the tubes
closest to the boom arm first, being careful not to pinch the tubes. Place the other tubes outside
of the first tubes. Snug all clamp bolts, but do not tighten. Check all tubes for correct alignment
and that none are pinched or bent. The clamp bolts can now be tightened.
(ASM-C-0085)
GENERAL HOSE INSTALLATION
Refer to the Parts Section for detailed information about hoses and fittings for this
application.
(ASM-C-0011)
HOSE COVERING
Secure hoses together with zip ties wherever loose. Wrap the hoses between the swivel and
main boom with the hose cover provided. Wrap the hoses between the main boom and
secondary boom with the hose cover provided. Where hoses may contact the frame or other
edges, wrap with split hose and secure with hose clamps or zip ties.
On non-cab units, the pressure and return hoses from the control valve will also need to be
routed inside the protective hose wrap. Cover the valve and valve fittings with the hose cover
and secure with the string provided.
(ASM-C-0058)
ACCUMULATOR INSTALLATION
Install the accumulator bracket on the right mainframe mast or lift valve mount, if applicable,
with the capscrews, lockwashers and spacers, if applicable, as shown in the Parts Section.
Install the accumulator in the bracket and secure with the hardware shown. Install fittings and
hoses to the cylinder and control valve as shown in the Parts Section.
Use teflon tape on all
pipe fittings (except O-rings).
(ASM-C-0012)
Содержание SABER BOOM JD6145-55M/R T4F
Страница 6: ......
Страница 8: ......
Страница 9: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION...
Страница 27: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY...
Страница 28: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY...
Страница 29: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY...
Страница 30: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY...
Страница 31: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY...
Страница 33: ...Assembly Section 2 1 ASSEMBLY SECTION JD6145 55M R SABER BOOM...
Страница 53: ...ASSEMBLY Assembly Section 2 21 ASM DF CALIBRATION SBR 0001...
Страница 61: ...2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc OPERATION SECTION...
Страница 81: ...OPERATION RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc OPERATION 9 5 0 1 220 9 5 6 21 5 220 9 5 52...
Страница 82: ...OPERATION RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc OPERATION 9 5 220 6 9 9 5 220 6...
Страница 85: ...OPERATION RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc OPERATION Joystick Control 2 67 029 6 0 1 220...
Страница 106: ...OPERATION RRP 2SHUDWLRQ 6HFWLRQ 2013 Alamo Group Inc OPERATION...
Страница 107: ...Maintenance Section 4 1 2019 Alamo Group Inc MAINTENANCE SECTION...
Страница 137: ...MAINTENANCE Saber Maintenance Section 4 31 2019 Alamo Group Inc MAINTENANCE...
Страница 140: ...MAINTENANCE Saber Maintenance Section 4 34 2019 Alamo Group Inc MAINTENANCE...
Страница 141: ...PARTS SECTION JD6 5 5M R 6 5 BOOM...
Страница 143: ...PARTS ORDERING GUIDE 2017 Alamo Group Inc Parts Section 3 JD6145 55M R SABER...
Страница 144: ...TRACTOR MOUNT KIT 2017 Alamo Group Inc Parts Section 4 JD6145 55M R SABER...
Страница 146: ...TRACTOR MOUNT KIT HYDRAULICS 2017 Alamo Group Inc Parts Section 6 JD6145 55M R SABER...
Страница 148: ...SABER BOOM MOUNT 2017 Alamo Group Inc Parts Section 8 JD6145 55M R SABER...
Страница 150: ...ELECTRONIC PROPORTIONAL LIFT VALVE MOUNT 2017 Alamo Group Inc Parts Section 10 JD6145 55M R SABER...
Страница 152: ...JOYSTICK AND SWITCHBOX MOUNT 2017 Alamo Group Inc Parts Section 12 JD6145 55M R SABER...
Страница 154: ...AXLE STABILIZER VERSION ONE 2017 Alamo Group Inc Parts Section 14 JD6145 55M R SABER...
Страница 156: ...AXLE STABILIZER VERSION TWO 2017 Alamo Group Inc Parts Section 16 JD6145 55M R SABER...
Страница 165: ...PARTS SECTION COMMON SABER BOOM 7 Parts Section 6 1...
Страница 168: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Parts Section 4 COMMON SABER T4...
Страница 169: ...NOTES 2015 Alamo Group Inc Parts Section 5 COMMON SABER T4...
Страница 170: ...BOOM SWIVEL ASSEMBLY 2015 Alamo Group Inc Parts Section 6 COMMON SABER T4...
Страница 172: ...QUICK COUPLERS 2015 Alamo Group Inc Parts Section 8 COMMON SABER T4...
Страница 180: ...50IN FLAIL ASSEMBLY 2015 Alamo Group Inc Parts Section 16 COMMON SABER T4...
Страница 182: ...50IN FLAIL ASSEMBLY PASS THROUGH KNIVES 2015 Alamo Group Inc Parts Section 18 COMMON SABER T4...
Страница 184: ...50IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 20 COMMON SABER T4...
Страница 188: ...SABER DIRECT DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 24 COMMON SABER T4...
Страница 190: ...63IN FLAIL ASSEMBLY 2015 Alamo Group Inc Parts Section 26 COMMON SABER T4...
Страница 192: ...63IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 28 COMMON SABER T4...
Страница 202: ...60IN ROTARY KNIFE AND DISH OPTION 2015 Alamo Group Inc Parts Section 38 COMMON SABER T4...
Страница 204: ...SABER SPINDLE ASSEMBLY 2015 Alamo Group Inc Parts Section 40 COMMON SABER T4...
Страница 206: ...SABER XB 60IN SPINDLE ASSY 2015 Alamo Group Inc Parts Section 42 COMMON SABER T4...
Страница 208: ...ROTARY MOWER SPINDLE ASSEMBLY 2015 Alamo Group Inc Parts Section 44 COMMON SABER T4...
Страница 216: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 52 COMMON SABER T4...
Страница 218: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Parts Section 54 COMMON SABER T4...
Страница 220: ...50IN FLAIL DIRECT DRIVE MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 56 COMMON SABER T4...
Страница 222: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 58 COMMON SABER T4...
Страница 224: ...COOLER ASSEMBLY 2015 Alamo Group Inc Parts Section 60 COMMON SABER T4...
Страница 226: ...CABLE MANUAL LIFT VALVE 4 SPOOL 06502104 2015 Alamo Group Inc Parts Section 62 COMMON SABER T4...
Страница 228: ...CABLE MANUAL LIFT VALVE 5 SPOOL 06502103 2015 Alamo Group Inc Parts Section 64 COMMON SABER T4...
Страница 233: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2015 Alamo Group Inc Parts Section 69 COMMON SABER T4...
Страница 236: ...MANUAL LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 72 COMMON SABER T4...
Страница 238: ...ELECTRONIC LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 74 COMMON SABER T4...
Страница 240: ...JOYSTICK SWITCHBOX SCHEMATIC 2015 Alamo Group Inc Parts Section 76 COMMON SABER T4...
Страница 241: ...TROUBLESHOOTING 2015 Alamo Group Inc Parts Section 77 COMMON SABER T4...
Страница 242: ...TROUBLESHOOTING CONTINUED 2015 Alamo Group Inc Parts Section 78 COMMON SABER T4...
Страница 243: ...HYDRAULIC TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 79 COMMON SABER T4...
Страница 244: ...ELECTRICAL TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 80 COMMON SABER T4...
Страница 245: ...WETCUT 2014 Alamo Group Inc Parts Section 6 93 COMMON SABER...
Страница 248: ...WETCUT 3PNT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 96 COMMON SABER...
Страница 250: ...WETCUT 3PNT PLUMBING LARGE MOWERS 2014 Alamo Group Inc Parts Section 6 98 COMMON SABER...
Страница 252: ...WETCUT FRONT PLUMBING 50IN MOWERS 2014 Alamo Group Inc Parts Section 6 100 COMMON SABER...
Страница 254: ...WETCUT FRONT PLUMBING LARGER MOWERS 2014 Alamo Group Inc Parts Section 6 102 COMMON SABER...
Страница 256: ...WETCUT 50IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 104 COMMON SABER...
Страница 258: ...WETCUT 60IN SPRAYER HEAD ASSEMBLY 2014 Alamo Group Inc Parts Section 6 106 COMMON SABER...
Страница 260: ...WETCUT CABLES 2014 Alamo Group Inc Parts Section 6 108 COMMON SABER...
Страница 261: ...WARRANTY SECTION Warranty Section 7 1...
Страница 262: ......
Страница 266: ...Printed in USA Tiger Corporation...