background image

Project Serve Assembly Guide                                                                                                                                                                                                                                  

Post Installation Maintenance: Monitoring Power Supply

14

10 GbE Ports

You can view the status of your connection through a 10 GbE port using the LED 
indicators above it.

1 GbE Ports

You can view the status of your connection through an 1 GbE port using the LED 
indicators above it.

Monitoring Power Supply

You can monitor the activity of the power modules using their LED indicator:

Post Installation Maintenance

Replacing a Failed Power Module

Your Project Serve is shipped to you with two power supply modules, installed in the 
rear of the appliance. These modules supply redundant power to Project Serve - 
should a power supply module fail, you can replace it while the system is operating. 
You can replace a failed power module only with a power module of the same model.

To replace a failed power module:

1.

Find the failed power module (the light of its LED indicator is solid red or there’s 
no light at all).

power status LED

green

blinking

stand by 
(power is on, but the 
system is not turned 
on)

solid

power on

Indicator

LED color

Status

Description

activity LED
(left indicator)

green

blinking

The adapter is sending or 
receiving network data at 
up to 10Gbps.

-

-

No network activity on the 
link.

link LED
(right indicator)

amber

solid or 
blinking

The 10GbE LAN card is 
initialized.

-

-

The adapter is not 
receiving power or the 
10GbE LAN card is not 
initialized.

Indicator

LED color

Status

Description

speed LED
(left indicator)

amber

solid

Operating as a Gigabit 
connection (1000 Mbps).

green

solid

Operating as a 100-Mbps 
connection.

-

-

Operating as a 10-Mbps 
connection.

link LED
(right indicator)

green

blinking

There is activity on this 
port.

-

-

No link is established.

Indicator

LED color

Status

Description

power module

green

blinking

system is in stand by mode

solid

normal mode

red

blinking

no power

solid

power module failure

Содержание Project Serve

Страница 1: ...ng Project Serve 5 Installing Project Serve 7 Installing The Front Panel Bezel 7 Connecting The Appliance to The Power 9 Powering On The Appliance 9 Connecting Project Serve to the Network 9 Hardware Monitoring 13 Monitoring the System Status 13 Monitoring Power Supply 14 Post Installation Maintenance 14 Replacing a Failed Power Module 14 ...

Страница 2: ... modified to be consistent with such local law Under such local law certain disclaimers and limitations of this Warranty Statement may not apply to the customer For example some states in the United States as well as some governments outside the United States including provinces in Canada may Preclude the disclaimers and limitations in this Warranty Statement from limiting the statutory rights of ...

Страница 3: ...ch as a separate local drive The appliance is shipped fully configured to you To deploy Project Serve you should simply 1 Rack mount the appliance or install it on a table top see Installing Project Serve on page 7 2 Connect the appliance to the same network as the network shares and client computers see Connecting Project Serve to the Network on page 9 3 Connect the appliance to the power source ...

Страница 4: ...al Characteristics Front View Project Serve s front features the front panel bezel flanges and the controls of the appliance System reset button and system power button Tip Once you install the front panel bezel you can user the system reset and system power buttons at the back of the appliance USB 2 0 port for firmware updates and system recovery LED indicators for monitoring system status and co...

Страница 5: ...llowing types of cables for connection to the network Clients via 10GbE depending on the 10GbE adapter model fibre optic cable with LC connectors for SFP transceiver or copper cable with SFP transceiver patch cable with RJ 45 modular connectors Clients via 1GbE patch cable with RJ 45 modular connectors Site Installation Unpacking Project Serve Important Do not throw away any of the packaging compo...

Страница 6: ... the foam protectors 4 Take out the foam case with the appliance holding it at each side and place it on a surface ensuring that the system remains stable Important The appliance weighs approximately 15 kg Attempting to move it without assistance could cause personal injury Request assistance and use proper lifting techniques when lifting the appliance ...

Страница 7: ...o not plan to install your Project Serve in a rack and you opt for tabletop installation ensure that the surface is clean and in a safe location the appliance is stable its bottom faces down and its top faces up Tip To determine the top and bottom of the appliance use the text direction on the printed labels the appliance is installed off the floor dust that accumulates on the floor is drawn into ...

Страница 8: ...langes on each side of the appliance s front panel 2 Using your index finger push inward the release latch at each side of the bezel and slightly push the bezel to the front panel until you hear a clicking sound To remove the bezel with your index finger push inward the release latches at each side of the bezel and gently pull it away from the front panel ...

Страница 9: ...on its LED indicator is red blinking or solid or there is no light at all Powering On The Appliance To power on the appliance 1 Press once the power button at the back of the appliance 2 Wait until the button or the power status LED at the front becomes solid green To turn off the appliance Important It is advisable to always attempt to shut down the appliance through the web UI before resorting t...

Страница 10: ...nt is that all traffic including data from client computers to and from the project depot goes through the same network To deploy your Project Serve appliance in your existing office network you should simply connect the appliance to the Ethernet switch through the available 1GbE port Note If your office network uses 10GbE switch make sure that it supports 1GbE connection or use the 10GbE port of ...

Страница 11: ...re updates and also letting non client computers on the office network or over the Internet preview projects and proxy media in the Project Serve s web interface To deploy Project Serve in a hybrid network configuration connect its 10GbE port to the 10GbE Ethernet switch of the private network and then connect the 1GbE port of the Project Serve appliance to the office network To interconnect Proje...

Страница 12: ...t computer Plug other end of the cable in the 10GbE port of the Ethernet switch that is connected to client computers Note If you opt for interconnection via switch refer to your switch documentation for further setup instructions To connect a computer to the Admin port Note The Admin port is designed as a safety net in case you misconfigure the appliance s network identification and fail to conne...

Страница 13: ... of Project Serve allow you to monitor the system status You can monitor the system activity without removing the front panel bezel Indicator LED color Status Description system activity LED green solid system is idle green slow blinking once a second maintenance opera tions running while system is idle like disk defragmenta tion for exam ple green fast blinking more than 4 times a second system i...

Страница 14: ...led power module 1 Find the failed power module the light of its LED indicator is solid red or there s no light at all power status LED green blinking stand by power is on but the system is not turned on solid power on Indicator LED color Status Description activity LED left indicator green blinking The adapter is sending or receiving network data at up to 10Gbps No network activity on the link li...

Страница 15: ...Guide Post Installation Maintenance 15 2 Unplug its power cable from the module s socket 3 Holding the lever of the power module with your index finger push the side tab to the right and slide out the unit from the appliance ...

Страница 16: ...le until it makes full contact with the enclosure and you hear a clicking sound Tip To check that the power module is properly installed try to pull it out without pressing the side tab If the power module can be pulled out repeat the step again 5 Plug the power cable in the module s socket ...

Отзывы: