background image

 

 

 

place the device in a dry place and away from sources of heat; 

 

place the box-container; 

 

place the probes so read the temperature correctly, avoid the direct or indirect contact with the flame: 

 

 
T1 collector temperature probe  

install on the solar panel collector. 

T2 main boiler temperature probe 

install in the low part of the boiler, close to the heat exchanger linked to the solar panels. 

T3 main boiler temperature probe 

install in the top part of the boiler possibly close to the water delivery point 

T4 secondary boiler temperature probe 

install according to the diagram of configuration, for more indications refer to relative paragraph. 

 

make electrical wiring according to the numeration (fig. 2); 

 
The  wiring  to  power  supply  must  be  carried  out  only  after  the  connection  phase.  The  devices  connected  are 
protect from fuse 3,15A. 
 

TECHNICAL CHARACTERISTICS 

See table 4. (Appendix pag. 8) 
 

ATTENTION 

-

 

Keep sensor and power cables separate. Use free-braided bipolar screened cable min. cross-section 1.5 mm² 
and max. Length 25 m. 

-

 

The  appliance  must  be  wired  to  the  electric  mains  through  a  switch  capable  of  disconnecting  all  poles  in 
compliance with the current safety standards and with a contact separation of at least 3 mm in all poles. 

-

 

Installation and electrical wiring of this appliance must be made by qualified technicians and in compliance 
with the current standards. 

-

 

Before wiring the appliance be sure to turn the mains power off. 

 

In the view of a constant development of their products, the manufacturer reserves the right for changing technical data and features without prior notice. The 
consumer is guaranteed against any lack of conformity for 24 months from the time of delivery, according to the European Directive 1999/44/EC. The full text of 
guarantee is available on request from the seller. 
The company does not answer for which had damages to wrong wiring or improper use of the device. 
 

APPENDICE / APPENDIX 

 

Parametri / Parameters 

Simbolo/symbol 

Min  

Std  

Max  

Schemi di configurazione 
Diagrams of configuration 

ConF  (Config.) 

 

Tabella 1 Menu CONFIGURAZIONE / Table 1 CONFIGURATION Menu 

 

Parametri / Parameters 

Simbolo/symbol 

Min  Std 

Max  Cf. 0  Cf. 1  Cf. 2  Cf. 3  Cf. 4  Cf. 5 

Termostato differenziale 
Differential thermostat 

A31

 

(T1-T2) 

30 

 

 

 

 

 

 

Termostato massimo accumulo1 
Max boiler 1 thermostat 

A26 

(TH3Max) 

20 

70 

90 

 

 

 

 

 

 

Termostato di integrazione 
Integration thermostat 

A25 

(TH3min) 

20 

40 

90 

 

 

 

 

 

 

Termostato differenziale 
Differential thermostat   

A71

 

(T1-T4) 

30 

 

Termostato differenziale 
Differential thermostat   

A72

 

(T3-T4) 

30 

 

 

Termostato differenziale 
Differential thermostat 

A73

 

(T4-T3) 

30 

 

Termostato valvola sanitario 
Sanitary valve thermostat 

A22 

 (TH3) 

20 

30 

90 

 

 

Tabella 2 Menu PRINCIPALE / Table 2 MAIN Menu 

 
 

Содержание SOLAR BOX-200

Страница 1: ...ral switch ON OFF led di segnalazione attivazione uscite indicators of out operations display di visualizzazione temperature display for visualisation temperatures led di segnalazione soglie threshold...

Страница 2: ...A26 T1Sic A02 ICE P06 T1 2 A31 T1 4 A71 TH3 M A26 T1Sic A02 T4Sic A67 T1 4 A71 P4 TH3 M A26 T4Sic A67 T1 P1 T2 T3 T4 P3 P2 P4 T1 2 A31 T1 2 A31 T1 2 A31 CONFIGURAZIONE 4 P2 TH3 m A25 P4 TH3 A22 P3 TH...

Страница 3: ...no confrontate e cos calcolati i differenziali e i termostati Le uscite sono quattro P1 P2 P3 P4 e sono gestite in base alla configurazione fig 3 Funzione ICE Se la funzione abilitata quando la temper...

Страница 4: ...del collettore T1 sotto la soglia minima A03 impostata sul display verr visualizzato alternativamente il valore di temperatura della sonda e la scritta ICE quando poi la sonda raggiunge la temperatura...

Страница 5: ...robes Configuration Plant Probes 0 Integration boiler pool integration on sanitary T1 T2 T3 1 Two boilers integration boiler pool T1 T2 T3 T4 2 Boiler integration integration on sanitary T1 T2 T3 T4 3...

Страница 6: ...the damaging of the plant In case of breakdown of one or more probes the display shows digits and hyphens In case of breakdown of one or more probes the display shows 1 Lo the probe of the collector...

Страница 7: ...ectrical wiring of this appliance must be made by qualified technicians and in compliance with the current standards Before wiring the appliance be sure to turn the mains power off In the view of a co...

Страница 8: ...CE thermostat on T1 A03 T1ice 2 2 5 Tempo di accensione P1 ICE Time on P1 ICE t 05 timer 5 s 10 s 60 s Tempo di spegnimento P1 ICE Time off P1 ICE t 06 timer 1 m 20 m 60 m Tempo di TEST P1 Time TEST P...

Отзывы: