![THOMSON grass valley XtenDD Скачать руководство пользователя страница 132](http://html.mh-extra.com/html/thomson/grass-valley-xtendd/grass-valley-xtendd_manual_1110062132.webp)
5. Initial Installation
5 - 27
Planning and Installation - Rev. 0 / 04.2002
5.5
TIMING / GENLOCK ALIGNMENT (IN PREPARATION)
When source signals are fed into the switcher, it must be ensured that the time dif-
ference between the sources is not outside the operating range of the internal swit-
cher autophasers (XtenDD = 22
µ
s). The output signals of the sources must corre-
spond to the timing customary in operation. For instance, no EE picture in a VTR,
PB-Ref on CCVS etc.
The switcher’s Genlock Phase can be adjusted to the fed reference signal in the
range of -15 line to + 15 lines.
Autophasing
ME2
approx 22 us
approx 10 us
Min delay
approx 0.8 us
Aux outputs
Timing reference diagram XtenDD (-2)
ME4
approx 10 us
ME1
approx 10 us
PP / ME3 outputs, PVW
approx 41 us
Total timing position of XtenDD in respect to the reference input
approx minus 15 lines
approx plus 15 lines
PP
approx 10 us
ME1 outputs, PVW
range input
Содержание grass valley XtenDD
Страница 17: ...Contents VI Planning and Installation Rev 0 04 2002 ...
Страница 27: ...1 General 1 10 Planning and Installation Rev 0 04 2002 1 5 OVERALL BLOCK DIAGAM VIDEO ...
Страница 29: ...1 General 1 12 Planning and Installation Rev 0 04 2002 ...
Страница 33: ...2 Technical Data 2 4 Planning and Installation Rev 0 04 2002 ...
Страница 39: ...3 Mounting Instructions 3 6 Planning and Installation Rev 0 04 2002 ...
Страница 45: ...3 Mounting Instructions 3 12 Planning and Installation Rev 0 04 2002 ...
Страница 61: ...3 Mounting Instructions 3 28 Planning and Installation Rev 0 04 2002 ...
Страница 69: ...4 Connection and Startup 4 8 Planning and Installation Rev 0 04 2002 ...
Страница 71: ...4 Connection and Startup 4 10 Planning and Installation Rev 0 04 2002 ...
Страница 75: ...4 Connection and Startup 4 14 Planning and Installation Rev 0 04 2002 ...
Страница 79: ...4 Connection and Startup 4 18 Planning and Installation Rev 0 04 2002 ...
Страница 87: ...4 Connection and Startup 4 26 Planning and Installation Rev 0 04 2002 ...
Страница 101: ...4 Connection and Startup 4 40 Planning and Installation Rev 0 04 2002 ...
Страница 105: ...4 Connection and Startup 4 44 Planning and Installation Rev 0 04 2002 ...
Страница 137: ...5 Initial Installation 5 32 Planning and Installation Rev 0 04 2002 ...
Страница 138: ...5 Initial Installation 5 33 Planning and Installation Rev 0 04 2002 ...
Страница 141: ...6 Installing System Accessories 6 3 Planning and Installation Rev 0 04 2002 ...
Страница 162: ...6 Installing System Accessories 6 24 Planning and Installation Rev 0 04 2002 ...
Страница 172: ...6 Installing System Accessories 6 34 Planning and Installation Rev 0 04 2002 ...
Страница 196: ...7 Installing External Devices 7 24 Planning and Installation Rev 0 04 2002 ...
Страница 214: ...7 Installing External Devices 7 42 Planning and Installation Rev 0 04 2002 ...
Страница 218: ...7 Installing External Devices 7 46 Planning and Installation Rev 0 04 2002 ...
Страница 226: ...7 Installing External Devices 7 54 Planning and Installation Rev 0 04 2002 ...
Страница 244: ...7 Installing External Devices 7 72 Planning and Installation Rev 0 04 2002 ...
Страница 250: ...7 Installing External Devices 7 78 Planning and Installation Rev 0 04 2002 ...