31
Check clock lines and Check IM_Enable:
The ‘Check clock lines’ test and the ‘Check
IM_Enable’ tests require an extern jumper that routes the signals through the data lines back
to the computer for analysis. The ‘Check data lines’ test should always be performed prior to
running the ‘Check clock lines’ and ‘Check IM_Enable’ tests because those tests rely on the
data lines.
Screen shots for this routine are:
All 5 outputs high or low:
There are 5 outputs that connect the interface box to the chassis.
These 5 outputs can be toggled high or low. This test requires the technician to measure
each output to make sure it is high or low based on the test being run.
Screen shots for this routine are:
Содержание Chipper Check II
Страница 1: ...Chipper Check II User Manual...
Страница 2: ......
Страница 37: ......
Страница 38: ...TTCCIIUM...