
4
6.
Complete with 1 additional pass of heat
reflective tape.
Heat Reflective Tape
Glass Fiber Tape
Heat Tracing
7.
Cut FAK-1 top and base ends to match outside
diameter of tubing bundle and remove end
pieces.
Tubing
RTD
11
.
For HPT and FP cable, exchange grommet in
Terminator with GRW-GT2 provided in PETK-
3-ECM.
GRW-GT2
GRW
RTD
Tubing Bundle
Cut and Remove
to fit
Heat Tracing
Field Drilled
(By Others)
O-Ring
Expediter
Base
Mount Screw
and Washers
Weep Hole
FAK-1 Base
8.
Mount expediter base with o-ring to FAK-1 base
using (3) M5 mounting screws and lock washers.
Punch out weep hole.
Silicone
Gasket
9.
Install RTV silicone and gasket, cutting off excess.
Apply RTV sealant to both halves.
Drilled hole
for bundle
entry
Drilled holes
for securing
FAK-1
Drilled holes for
securing FAK-1
Use as template
14.
Field drill required entry hole in wall/plate. Use
the FAK-1 flange as a template and mark and
drill holes for bolts.
12.
Apply self-vulcanizing tape around bundle jacket
and work up over FAK ends.
Expediter Base
Heat Tracing
RTD
FAK-1
Bottom Cover
FAK-1
Top Cover
13.
Terminate heat tracing with appropriate PETK
termination kit. Refer to PETK installation
instructions for details (not addressed here).
RTD
Power Connection
Boot
Heat Tracing
Ground Braid
10.
Assemble FAK-1 top, tubing bundle, and FAK-1
bottom together as shown Snap together firmly.
Inspect ends of tubing splice cover for snug fit.
Apply additional RTV sealant where needed.
TraceNet
TM
ECM/FAK-1