TraceNet
TM
ECM-P/FAK-1
ECM—Electronic Control Module
Mounted on FAK-1 Bulkhead Entry
For Use With TubeTrace® Bundles
INSTALLATION PROCEDURES
Страница 1: ...TraceNet TM ECM P FAK 1 ECM Electronic Control Module Mounted on FAK 1 Bulkhead Entry For Use With TubeTrace Bundles INSTALLATION PROCEDURES...
Страница 2: ...icated PETK Power and End Termination Kits per cable PETK 1 for RSX VSX HT BSX PETK 2 for KSX HTSX PETK 3 ECM for HPT FP PT 100 3L RTD Control Sensor PT 100 3L RTD Limiter Sensor Provided by others 8...
Страница 3: ...s Component approvals and performance ratings are based on the use of Thermon specified parts only User supplied power connection fittings must be listed or certified for intended use De energize all...
Страница 4: ...asket cuttingoffexcess Apply RTV sealant to both halves Drilled hole for bundle entry Drilled holes for securing FAK 1 Drilled holes for securing FAK 1 Use as template 14 Field drill required entry ho...
Страница 5: ...lid and twist hand tight Insert screwdriver into ratchet slot located on side of junction box base to tighten Use screwdriver to ratchet on junction box lid Lid will rotate 30 for tight seal To remov...