Thermo Scientific
43iQHL Instruction Manual
2-1
Chapter 2
Installation and Setup
Installation and Setup describes how to unpack, setup, and start-up the
instrument. The installation should always be followed by instrument
calibration as described in the “
” chapter of this manual.
Equipment Damage
Do not attempt to lift the instrument by the cover or
other external fittings.
▲
The 43iQHL is shipped complete in one container. If there is obvious
damage to the shipping container when you receive the instrument, notify
the carrier immediately and hold for inspection. The carrier is responsible
for any damage incurred during shipment.
Use the following procedure to unpack and inspect the instrument.
1.
Remove the instrument from the shipping container and set it on a
table or bench that allows easy access to both the front and rear.
2.
Remove the cover to expose the internal components. (See “
3.
Check for possible damage during shipment.
4.
Check that all connectors and circuit boards are firmly attached.
5.
Re-install the cover.
6.
Remove any protective plastic material from the case exterior.
Unpacking and
Inspection
Содержание 43iQHL
Страница 1: ...43iQHL Instruction Manual High Level Sulfur Dioxide Analyzer 119015 00 1Apr2022...
Страница 2: ......
Страница 8: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 43iQHL Instruction Manual Thermo Scientific...
Страница 150: ......
Страница 172: ...Maintenance Pump Rebuilding 5 4 43iQHL Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding...
Страница 176: ......
Страница 192: ...Servicing Fan Replacement 7 8 43iQHL Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan...
Страница 238: ......
Страница 256: ......
Страница 264: ......
Страница 276: ......
Страница 277: ......