- 22 -
6
FIRST PUTTING INTO SERVICE AND USE
This chapter provides information about how to professionally put the furnace into
service for the first time and how to use it.
6.1
SAFE FIRST PUTTING INTO SERVICE AND USE
When putting the furnace into service for the first time and using it, please note
the hazards below:
DANGER
Read the following safety notes carefully before putting the furnace into service
for the first time.
Misuse can cause serious injuries.
Make sure that operating personnel are qualified as required.
Chapter 2.2 “QUALIFIED PERSONS”
Burning as a result of contact with hot furnace load
Observe the temperature display.
Follow the safety notes.
Wear personal protective equipment.
Chapter 2.3 “PERSONAL PROTECTIVE EQUIPMENT”
6.2
PUTTING INTO SERVICE
Requirements for putting into service are:
Installation is completed.
Chapter 5.2.2 “SETTING UP THE FURNACE”
Material to be sintered is available.
Temperature-time profile for the material is known.
Persons required during putting into service are:
Briefing service technician if necessary
Owner or user
If the furnace is first put into service or used without briefing, proceed in
accordance with the instruction manual.
6.2.1
OPERATIONAL CONDITION
Turn on the furnace using the main switch on the front and wait approx. 20
seconds. The internal control starts and loads the firmware. After booting, the
controller displays the START SCREEN and signals that the furnace is ready for use.
Содержание Denta-Star S1
Страница 40: ... 40 14 NOTES Use this page for notes ...