![Thermo Scientific TSQ 9000 Скачать руководство пользователя страница 438](http://html.mh-extra.com/html/thermo-scientific/tsq-9000/tsq-9000_hardware-manual_1104856438.webp)
3
Advanced Troubleshooting
Replacing the Turbomolecular Pump
410
TSQ 9000 Hardware Manual
Thermo Scientific
Replacing the Turbomolecular Pump
The turbomolecular pump is a multi-stage axial-flow turbine in which high speed rotating
blades provide compression by increasing the probability of gas molecules moving in the
pumping direction. The turbomolecular pump is optimized for molecular flow conditions
and requires the use of a rough pump to exhaust to atmosphere.
To install or replace the turbomolecular pump
1. Shut down your system by following the steps in
“Shutting Down the TSQ 9000 System”
. You do not have to remove the ion source cartridge.
2. Use a T20 Torxhead screwdriver to loosen the top cover panel screw from the front panel.
If you are using hydrogen you must also remove the hydrogen safety screws. Slide the top
cover panel toward the back of the instrument and lift it off.
3. Use a T20 Torxhead screwdriver to remove the five screws on the right side panel.
4. Make sure the electrometer board cable is not in the way when you remove the power
module.
5. Disconnect the power cables from the side of the TSQ 9000 instrument.
Note
See the
ISQ and TSQ GC-MS Spare Parts Guide
for ordering information.
Figure 436.
Removing the Right Side Panel Screws
Right Side
Panel Screws
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......