![Thermo Scientific TSQ 9000 Скачать руководство пользователя страница 408](http://html.mh-extra.com/html/thermo-scientific/tsq-9000/tsq-9000_hardware-manual_1104856408.webp)
3
Advanced Troubleshooting
Replacing the Calibration Gas Components
380
TSQ 9000 Hardware Manual
Thermo Scientific
10. Slide the analyzer tray to the left.
11. Use a 5/16 in. wrench to disconnect the stainless steel tubing from the two fittings on
each side of the transfer line.
Figure 405.
Disconnecting the Transfer Line Tubing
12. Disconnect the electrical cable from the connector.
Figure 406.
Disconnecting the Transfer Line Electrical Cable
13. Use a T20 screwdriver to remove the two screws holding the transfer line to the chassis.
14. Pull the transfer line straight away from the instrument so you do not damage it. Make
sure the o-ring is removed as well. Replace the o-ring, if necessary.
15. Attach a new transfer line.
Note
Keep all manifold parts you remove covered on a clean work surface so they will not
accumulate dust.
Note
If you are using CI gas, there are two tubes connected. If you are using an EI system,
there is one tube and one blanking ferrule connected.
Note
The reagent gas and calibration gas tubes in the manifold conduct gas to the mixing
chamber. Make sure these two tubes are attached to the transfer line and mixing chamber
before proceeding.
Tubing
Fittings
Cable
Connector
Содержание TSQ 9000
Страница 1: ...TSQ 9000 Mass Spectrometer Hardware Manual 1R120618 0003 Revision C December 2018 ...
Страница 8: ......
Страница 124: ...1 Performing Routine Maintenance Cleaning the Filters 96 TSQ 9000 Hardware Manual Thermo Scientific ...
Страница 476: ......