background image

1

  TriPlus 300 Headspace Site Preparation

Receiving Instruments

10

         TriPlus 300 Headspace Preinstallation Requirements Guide

Thermo Scientific

Receiving Instruments

When you receive the TriPlus 300 Headspace instrument:

1. Inspect the boxes for damage on arrival. Our instruments are shipped by electronic 

equipment carriers who specialize in the handling of delicate equipment. Occasionally, 
however, equipment is inadvertently damaged in transit. If you notice evidence of 
external damage, do not refuse shipment. Instead, call Customer Service.

2. Once you are finished inspecting your shipment, move the cartons to a protected 

location, preferably the installation site. Leave the boxes as complete as possible and do 
not unpack or open the boxes without our Field Service Engineer (FSE) present. Doing 
otherwise might void your warranty or order.

3. Complete the Installation Request Form located at the front of this guide and forwards it 

to Customer Support.

What Happens Next?

After the Installation Request Form is received, Customer Support will contact you to 
schedule the installation of your system. It is important to confirm that all the requirements 
on the form are met BEFORE the Field Service Engineer arrives.

The Field Service Engineer will install the system and confirm that all performance tests pass.

a.

If equipment is damaged, keep boxes and their equipment in their existing condition 
and immediately notify the carrier.

b. Submit a damage claim directly to the carrier, and send a copy (including any 

shortage claims) to your authorized Thermo Fisher Scientific sales representative.

c.

Do not return any equipment to the dealer or the factory without prior factory 
authorization.

Note  

We are not responsible for connecting to or establishing communication with your 

site LAN network. The FSE will test the system’s ability to communicate on a mini-hub or 
LAN switch only (preferable). 

 

 

The IP addresses assigned to the instrument must be fixed (permanently assigned) 
addresses. If you intend to connect your system to your site’s network, each piece of 
equipment must have a unique, fixed (static) IP address assigned to it. 

Содержание TriPlus 300

Страница 1: ...Thermo Scientific TriPlus 300 Headspace Sampling System Preinstallation Requirements Guide P N 317 09672 Revision C December 2015 ...

Страница 2: ...eference purposes only System configurations and specifications in this document supersede all previous information received by the purchaser Thermo Fisher Scientific Inc makes no representations that this document is complete accurate or error free and assumes no responsibility and will not be liable for any errors omissions damage or loss that might result from any use of this document even if t...

Страница 3: ...n site Principal operator will be available during the installation certification period Doorways hallways etc are a minimum width of 80 cm 32 in Available floor area is sufficient and flooring will support the mass of the system Available workbench is sufficient for all of the equipment List the bench measurements Width Depth Height Workbench can support the mass of the system 158 kg 348 lbs and ...

Страница 4: ......

Страница 5: ...service sid lesulis thermofisher com Phone 33 0 1 60 92 49 50 Fax 33 0 1 60 92 48 99 Germany Im Steingrund 4 6 D 63303 Dreieich E mail service dreieich thermofisher com Phone 49 0 6103 408 1050 Fax 49 0 6103 408 1213 Italy Strada Rivoltana I 20090 Rodano Milano E mail assistenza tecnica it thermofisher com Phone Numero Verde 800 823 162 Fax 39 02 95320 225 Netherlands Takkebijsters 1 NL 4817 BL Br...

Страница 6: ...Fax 44 0 1442 233 667 Australasia and Asia Australia P O Box 9092 5 Caribbean Drive Scoresby VIC 3179 E mail analyze au thermofisher com Phone 61 39757 4300 Fax 61 9763 1169 Japan C 2F 3 9 Moriya cho Kanagawa ku Yokohama 221 0022 E mail analyze jp thermofisher com Phone 81 45 453 9100 Fax 81 45 453 9110 P R China 7th Floor 7F Tower West Younghe Plaza No 28 Andingmen East Street Dong Cheng District...

Страница 7: ...da Rivoltana 20090 Rodano Milan Italy Tel 39 02 950591 Fax 39 02 9505276 Regulatory Compliance Thermo Fisher Scientific performs complete testing and evaluation of its products to ensure full compliance with applicable domestic and international regulations Thermo Fisher Scientific declares under sole responsibility that the product as originally delivered complies with the requirements of the fol...

Страница 8: ...s In compliance with international regulations Use of this instrument in a manner not specified by Thermo Fisher Scientific could impair any protection provided by the instrument Notice on the Susceptibility to Electromagnetic Transmissions Do not use radio frequency transmitters such as mobile phones in close proximity to the instrument THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES OPERATION...

Страница 9: ...dieses Produkt durch diese Firmen wiederverwertet oder entsorgt werden kann Mehr Information über die Einhaltung dieser Anweisungen durch Thermo Fisher Scientific über die Verwerter und weitere Hinweise die nützlich sind um die Produkte zu identifizieren die unter diese RoHS Anweisung fallen finden sie unter www thermoscientific com rohsweee Conformité DEEE Ce produit doit être conforme à la direc...

Страница 10: ...ea y estas empresas deberían reciclar o eliminar este producto Referirse a www thermoscientific com rohsweee para una mayor información sobre la conformidad de Thermo Fisher Scientific con estas Directivas y para las empresas de reciclaje en su país IMPORTANT The symbol indicates the product must not be disposed of with the normal household wastes Correct disposal of this product prevents any pote...

Страница 11: ...cal Hazards xviii Other Hazards xx Working with Toxic or other Harmful Compounds xxi Biological Hazard Warning Note xxi Maintenance xxii Disposal xxii Chapter 1 TriPlus 300 Headspace Site Preparation 1 Entrance Requirements 2 Space and Load Requirements 2 GC GC MS System TriPlus 300 Headspace Configuration Space and Mass Requirements 3 Lighting Requirements 4 Power Requirements 4 Power Line 5 Elec...

Страница 12: ...Contents xii TriPlus 300 Headspace Preinstallation Requirements Guide Thermo Scientific ...

Страница 13: ... impaired If you maintain a system outside the specifications listed in this guide failures of many types including personal injury or death might occur The repair of instrument failures caused by operation in a manner not specified by the manufacturer is specifically excluded from the Standard Warranty and service contract coverage Power Rating Main Unit 100 120 200 240 Vac 10 max 60 Hz 1300 VA 1...

Страница 14: ...ientific provides the following documents for the TriPlus 300 Headspace TriPlus 300 Headspace Preinstallation Requirements Guide PN 31709672 TriPlus 300 Headspace User Guide PN 31709671 To suggest ways we can improve the documentation follow this link to complete our documentation survey Safety Alerts and Important Information Make sure you follow the precautionary notices presented in this manual...

Страница 15: ...flammability could or might occur EXPLOSION HAZARD Indicates an explosion hazard This symbol indicates this risk could or might cause physical injury FLAMMABLE GAS HAZARD Alerts you to gases that are compressed liquefied or dissolved under pressure and can ignite on contact with an ignition source This symbol indicates this risk could or might cause physical injury GLOVES REQUIRED Indicates that y...

Страница 16: ...osure to a toxic substance could occur and that exposure could or might cause personal injury or death LASER HAZARD Indicates that exposure to a laser beam will could or might cause personal injury RADIOACTIVE HAZARD Indicates that the presence of radioactive material could or might occur For the prevention of personal injury this general warning symbol precedes the WARNING safety alert word and m...

Страница 17: ...quipotentiality On Supply Off Supply Equipment protected throughout by DOUBLE INSULATION or REINFORCED INSULATION Equivalent to Class II of IEC 536 Fuse Jack socket Instruction manual symbol affixed to product Indicates that the you must refer to the manual for specific WARNING or CAUTION information to avoid personal injury or damage to the product Caution risk of electric shock Caution hot surfa...

Страница 18: ...ry out that specific task Electrical Hazards Every analytical instrument has specific hazards Be sure to read and comply with the following pre cautions They ensure the safe and long term use of your TriPlus 300 Headspace sampling system The installation over voltage category is Level II The Level II category pertains to equipment receiving its electrical power locally such as from an electrical w...

Страница 19: ...pling system shows visible signs of damage exposure to any liquids or has been transported under severe stress Damage can also result if the instrument is stored for prolonged periods under unfavorable conditions for example subjected to heat moisture and so on Ensure that the power supply controller unit is always placed in a clean and dry position Avoid any liquid spills in the vicinity Before a...

Страница 20: ...he peak shape immediately determine the reasons for the changes Do not rely on the separation results until you determine the cause of a change Do not operate on the instrument components that form part of the work area of the TriPlus 300 Headspace sampling system when it is in motion Do not use vials without a sealing cap Vapor phase from organic solvents can be hazardous and flammable Acidic vap...

Страница 21: ...s which might become contaminated with biohazardous material The appropriate warning labels are included with the shipment of the instrument It is the user s responsibility to label the relevant parts of the equipment When working with biohazardous materials you are responsible for fulfilling the following mandatory requirements Providing instructions on how to safely handle biohazardous material ...

Страница 22: ...essary precautions abiding by national and international regulations When preparing for decontamination ensure that the solvent or chemical to be used will not damage or react with the surface or dye color of the instrument table or other nearby objects If in doubt please contact your Thermo Fisher Scientific representative to verify the compatibility of the type or composition of solvents with th...

Страница 23: ... of such failures is specifically excluded from the standard warranty and service contract coverage Contents Entrance Requirements Space and Load Requirements Lighting Requirements Power Requirements Environment Requirements Gas Equipment Requirements LAN Network Requirements Receiving Instruments What Happens Next CAUTION This guide does not includes the information to prepare your lab for the in...

Страница 24: ... into elevators or through doorways The table below contains the dimensions and weight of shipping boxes so that you can make accommodations Space and Load Requirements TriPlus 300 Headspace sampling system must be installed on the left of the GC GC MS units Use the following tables to verify and determine the space and mass requirements for the instrument of your GC GC MS system Table 1 Container...

Страница 25: ...ctor Use Table 3 to determine the space and mass requirements according to your GC GC MS system TriPlus 300 Headspace sampling system configuration IMPORTANT The measure reported in the tables are rounding up for excess The tables do not include optional instruments e g computers printers etc The GC GC MS system should be placed on a workbench that has minimum dimensions of 0 75 2 m 2 5 6 ft Table...

Страница 26: ...1 cm between a GC and a ISQ Series mass spectrometer 5 cm between a GC and a ITQ mass spectrometer 5 cm between a GC and a DSQ II mass spectrometer A distance of about 3 5 cm between the GC GC MS system and the TriPlus 300 is left for opening the top cover of the Main through the two lateral push buttons The dimensions reported in Table 3 consider a distance of 5 cm Table 3 Overall Dimensions of t...

Страница 27: ...nerate disturbances Pay attention not to leave any cable connecting the sampling unit and the chromatographic system or the power cord close to the GC hot air vents Occasionally unacceptable quality in line power sources might adversely affect the operation of the GC GC MS system It is the user s responsibility to correct line voltage problems Specifying power conditioning equipment is a complex t...

Страница 28: ...nsure your site has the proper environmental conditions for the system The TriPlus 300 Headspace sampling system operates in an environment where normally only non conductive pollution occurs but in which temporary conductivity due to condensation must be expected This is a Pollution Degree 2 environment as specified in International Standard EN 61010 1 1993 and subsequent amendments Use the follo...

Страница 29: ...ents of the instrument ESD can damage sensitive components resulting in premature failures Take the following precaution to prevent electrostatic discharge Use a static dissipating floor covering such as tile or conductive linoleum in the room housing your instrument Use laboratory chairs covered with natural fibers or other static dissipating material Wear laboratory coats and clothing made from ...

Страница 30: ...as must be reviewed by appropriate health and safety staff and all installations of hydrogen systems must be performed to applicable codes and standards Thermo Fisher Scientific assumes no liability for the improper use of hydrogen as a carrier gas All Thermo Fisher Scientific gas chromatographs normally uses an inert gas as carrier gas If you wish to use hydrogen as a carrier gas the hydrogen sen...

Страница 31: ...t damage cables or gas lines Ensure they are secured in accordance with standard safety practices LAN Network Requirements The connection between the TriPlus 300 Headspace instrument and a Thermo Scientific Chromatography Data System Chromeleon Xcalibur Chrom Card ChromQuest must be carried out via Local Area Network LAN Your lab must be provided with one or more RJ 45 wall outlet To connect your ...

Страница 32: ...ppens Next After the Installation Request Form is received Customer Support will contact you to schedule the installation of your system It is important to confirm that all the requirements on the form are met BEFORE the Field Service Engineer arrives The Field Service Engineer will install the system and confirm that all performance tests pass a If equipment is damaged keep boxes and their equipm...

Отзывы: