7
Detectors Advanced Maintenance
Cleaning or Replacing the FPD Filter-side Heat Shields
300
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
Cleaning or Replacing the FPD Filter-side Heat Shields
Before cleaning or replacing the FPD filter-side heat shield, read the following precautions:
To clean or replace the FPD filter-side heat shield
1. Put the GC in standby condition.
2. Switch off the flame. Hydrogen and air are automatically closed.
3. Cool the detector to room temperature.
4. Power off the GC.
a.
Push down the power switch (breaker), located at the back of the instrument, to the
position O.
b. Unplug the power cable from the AC Input connector into the back of the GC and
from the wall outlet
5. If other external modules are present, unplug the power cable from the AC Input
connector of each module, and from the wall outlet.
6. Remove the FPD detector from the base.
a.
Disconnect the signal, excitation voltage, and ignition/heating cables from the
detector. See
.
WARNING
Carry out all the operations at low temperature to avoid burns. Therefore,
before beginning maintenance, cool the detector to room temperature.
CAUTION
When handling organic solvents you must take precautions to avoid health
hazards.
Materials needed
FPD fixing tools
Paper towels
FPD maintenance kit
Methylene chloride or GC-grade methanol
1-mm Allen wrench
Screwdriver
Note
By pressing the
Maintenance
button, the GC cool down is automatically
carried out.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......