3
Performing Injectors Routine Maintenance
Maintaining a Split/Splitless Injector (SSL)
86
TRACE 1300 and TRACE 1310 Hardware Manual
Thermo Scientific
12. Close the module flap cover.
13. If present, move the autosampler towards the module to restore the original alignment.
14. Turn the carrier gas on.
15. Set the normal injector, detector, and GC working conditions.
Replacing a SSL Broken Liner
To replace a broken liner
Figure 79.
SSL Injector: Broken Liner Replacement
1. Put the GC in standby condition.
2. Cool the oven and injector to room temperature.
Liner
Liner Seal
Retaining Nut
Washer
Base Seal
Ferrule
Septum Cap
Ring Nut
Septum Holder/Liner Cap with Septum
Capillary Column Retaining Nut
Terminal Fitting for Capillary Column
Bottom Fittings
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......