4.3.2.1.
Steel Cord Installation: mechanical mounting
WARNING
The correct installation of the steel cord, according to the directions set out below,"
La corretta installazione della fune, in accordo con le indicazioni specificate di
seguito, is a primary condition to ensure the proper functioning of the
protection device.
The installation of the steel rope is by using a set of accessories described and listed
below :
•
Safety Spring (1)
: installed at the ends, are used to maintain tension in the steel rope,
in
step d 'installation must be properly tensioned, to ensure that in case of breakage,
the switch is pressed by the spring installed on the opposite side.
•
Redance (2)
: installed near the springs of security needed to create the terminal loop of
the rope, and allows the fixing of the rope by the steel cord clampe.
•
Steel Cord Clamp (3)
: installed after the redance allow you to set the end of the
rope
made up the ring back.
•
Helicoidal Nut (4)
: installed on the fixed points has the function to end support,
installed
at intervals of max. 3 mt. along the rope, serves to support the rope to avoid
that the same goes slack.
•
Red Steel Cord (5)
: The steel cord is flexible plastic, which is the element to operate
the
lever switch.
Fig. 4-3-2-1
Referring to the drawing figure 4-3-3, install the device and its accessories as described:
14 / 30
Cod.: PL-000603X-D002G
Содержание PRO-LINE 60-30G
Страница 25: ...8 ANNEX 25 30 Cod PL 000603X D002G ...
Страница 26: ...26 30 Cod PL 000603X D002G ...
Страница 27: ...27 30 Cod PL 000603X D002G ...
Страница 28: ...28 30 Cod PL 000603X D002G ...
Страница 29: ...29 30 Cod PL 000603X D002G ...
Страница 30: ...30 30 Cod PL 000603X D002G ...