![Thermo Scientific ISQ EC Скачать руководство пользователя страница 137](http://html.mh-extra.com/html/thermo-scientific/isq-ec/isq-ec_operating-manual_1105091137.webp)
6
Operation
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Page 137
Figure 76: IC MS Instrument Panel
Parameter
Description
Status window
Indicates whether the system is ready to operate. Status window will
show as “busy” while the instrument is in acquisition mode
Instrument
connect
Enables direct software control over the MS instrument. This can be
toggled “on” or “off” with the slide bar.
Real time scan
Feature that allows user to immediately trigger acquisition mode. A
new window will appear with real-time scanning data and ability to
adjust instrument parameters.
Manual tune
This mode is for service engineers to set up the instrument. Do not
use this mode for other purposes.
Sheath gas
pressure status
Displays the main nitrogen gas pressure used for desolvation/
nebulization.
Sweep gas
pressure status
Counter-flow gas pressure coming out of sweep cone. Used for dirtier
sample matrices and more complex mobile-phase compositions
Aux gas
pressure status
Gas flow around the outside of the spray needle. This gas can be
heated to aid in desolvation
Vaporizer temp
status
Heat applied to aux gas to aid in desolvation
Ion transfer
tube temp
status
Heat applied to the ion transfer tube, which carries ions into the ion
optics. Used to further desolvate the ions
Source voltage
status
Voltage applied to ESI capillary for ionization
Source current
status
Current of the source voltage
Chromatogram
window
This window will activate with the real-time data display during
acquisition mode or during an automated batch sequence
Foreline
pressure status
Foreline pump pressure
Table 5
: MS Instrument ePanel functions
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...