3
Advanced Maintenance
Replacing Components of the Analyzer
162
ISQ 7000 Hardware Manual
Thermo Scientific
6. Hold the quadrupole in the tray and make sure the quad assembly and the ion guide are
correctly positioned before tightening the screws on the entrance lens endcap
7. Reattach the screws on each side of the exit endcap. Make sure the quadrupole and exit
endcap are fully forward before tightening screws.
8. Attach the wire connecting the quadrupole entrance lens to the source interface board by
screwing in the terminal with a slotted screwdriver.
Replacing the Analyzer Tray
To replace the analyzer tray
1. Put tray in manifold with transfer line out or pulled away.
a. If the gas tubes are attached to the transfer line, it will not pull as far away from the
path of the tray as would be best. Be extra careful not to scratch the end of
transferline with the tray, because that could cause a leak with the source plug later.
b. Do not screw in the analyzer tray until the transfer line is fully screwed in.
Figure 132.
Reattaching the Quadrupole and Ion Guide to the Analyzer Tray
Screws
Exit Endcap
Entrance Endcap
Note
The analyzer tray will mount on one alignment pin in the back and the transfer line
on the right. The mixing chamber will rest on the transfer line when installed.
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...