General Pre-Installation Information
Installation
Thermo Scientific
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
6-3
Installation
It is the policy of Thermo Fisher Scientific that the customer should not
unpack the system or accessory items prior to installation of the system.
NOTICE
Where buck/boost transformers or power conditioning units
are supplied, it is the responsibility of the operator to have these units
installed by an electrician prior to instrument installation.
▲
NOTICE
A forklift or a pallet jack will be of great benefit for unpacking
and in-house transportation of the instrument components.
▲
Installing the System
When your new instrument is on site and ready for installation, a
Thermo Fisher Scientific field service engineer will install it.
During the installation, the Thermo Fisher Scientific field service
engineer will demonstrate the following:
•
The basics of equipment operation and routine maintenance.
•
The performance specifications that are in force at the time of the
purchase of the system.
NOTICE
Consumables sent with the system are intended for use by the
Thermo Fisher Scientific field service engineer during the installation.
▲
Key Operator
Experience has shown that the maximum benefit can be derived from a
scientific instrument if there is one person, a key operator, who has
major responsibility for that instrument. Thermo Fisher Scientific
recommends that you designate a key operator to oversee the operation
and maintenance of the system in your laboratory. The key operator
should be available to the installing engineer throughout the
installation. This person will also be the key figure in the
communication between your laboratory and Thermo Fisher Scientific.
NOTICE
Do not plan to use your new system for sample analysis until
the installation is complete and the Acceptance Form has been signed.
▲
Содержание iCAP RQ ICP-MS
Страница 1: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 2: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 69: ...I 4 iCAP RQ Pre Installation Requirements Guide P N BRE0009927 Revision A Thermo Scientific Index W W ...
Страница 71: ......