General Pre-Installation Information
Instrument Arrival
6-2
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
Thermo Scientific
Instrument Arrival
When your lab site preparation is completed, and the system is
delivered, call your local Thermo Fisher Scientific office to arrange for
an installation date.
Thermo Scientific instruments are transported either by carriers who
specialize in the handling of delicate machinery, or for long distance
shipment by airfreight. Occasionally, however, equipment inadvertently
does get damaged in transit.
Take the following precautions when receiving material:
•
Check carefully for obvious damage or evidence of rough handling.
•
If external damage is apparent, take photographs, note this fact on
all copies of the receiving documents and describe briefly the extent
of the damage. Drivers should sign (or put their initials) next to your
comments to signify agreement with your observations.
•
Contact your Thermo Fisher Scientific office to report the damage
and—please—let Thermo Fisher Scientific field service engineers
check for further damage.
NOTICE
If the instrument shipping container, ShockWatch™, or other
indicator shows any evidence of damage or mishandling during
shipment, do NOT open the container. Call your Thermo Fisher
Scientific representative for instructions on what to do. If the system
arrives safely, proceed with the following instructions.
▲
NOTICE
Freight insurance requires that obvious damage be noted on
the receiving documents. Thermo Fisher Scientific will not accept
liability for damage if materials are received with obvious damage and
the damage is not recorded on the receiving documents.
▲
When your system arrives,
move it to a protected location indoors
,
preferably the installation site. Take the specifications described for the
laboratory in this guide as a guideline for the temperature and humidity
in the storage room. If you have questions about moving your system,
contact your local Thermo Fisher Scientific office.
Transportation Risk
Transportation risk depends on the terms of delivery agreed. The terms
of shipment determine who has responsibility for filing a claim against
the carrier if the system is damaged in transit.
Содержание iCAP RQ ICP-MS
Страница 1: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 2: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 69: ...I 4 iCAP RQ Pre Installation Requirements Guide P N BRE0009927 Revision A Thermo Scientific Index W W ...
Страница 71: ......