Using EA IsoLink IRMS System for CNSOH
Before Starting a Sulfur Measurement
110
EA IsoLink IRMS System for CNSOH Operating Manual
Thermo Scientific
5. Ensure the inlet heater and the ion source are heated.
6. Install the properly packed reactor within the Elemental Analyzer.
7. Replace all stainless steel tubing with Teflon®/Sulfinert® tubing to avoid water condensation in the
system.
8. Simply insert the wires into the plug socket where they fix themselves.
Reactor Filling
We recommend to use a Thermo Fisher Scientific ready for use reactor (P/N 468 02021). The reactor
is 470 mm long. If the reactor must be packed by the user, the packing should be as shown in
.
Figure 124.
Packing of the Reactor
About
150
to
200
analyses can be performed using the reactor type described above.
Before Starting a Sulfur Measurement
We assume that the user already has working experience with the isotope ratio mass spectrometer.
Before starting a sulfur measurement make sure that:
1. The Elemental Analyzer is set up, that is:
• The SO
2
reactor is packed and installed.
• The water trap is installed.
2. The special SO
2
stainless steel (or Teflon®) GC column is installed.
3. The connection between reactor, water trap, GC column and ConFlo is made up of Teflon®
tubing.
Note
Take care that the wires of the heating foil point downwards when pasting it on the
manometer’s rear side.
130 mm
30 mm
60 mm
20 mm
Quartz Wool
Quartz Wool
Electrolytic Copper
Tungsten Oxide
Quartz Wool
10 mm