2
Maintaining the DSQ II
Replacing the Electron Multiplier
60
DSQ II Hardware Manual
Thermo Scientific
5. Remove the ion detector.
Figure 34.
Removing the Ion Detector
a.
Disconnect the conversion dynode and electron multiplier connectors from the
connectors on the bottom of the vacuum manifold.
b. Remove the two screws holding the ion detector to the vacuum manifold.
6. Disassemble the ion detector and remove the multiplier.
1
Ion Detector
4
Two Screws on Ion Detector
2
Conversion Dynode Connector
5
Vacuum Manifold
3
Electron Multiplier Connector
1
4
2
3
5
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...