2
Maintaining the DSQ II
Maintaining Components Outside the Vacuum Manifold
Thermo Scientific
DSQ II Hardware Manual
91
Replacing the Foreline Pressure Gauge and Foreline Adapter
To replace the foreline pressure gauge and foreline adapter, you will need:
• Foreline Pressure Gauge and Foreline Adapter (PN 119259-0002 for 250 L/s and
split-flow turbomolecular pump systems or PN 119259-0003 for 70 L/s turbomolecular
pump systems)
• Lint-free paper
• Screwdriver, flat blade
• Wrench, adjustable
1. Cover the work area with a lint-free cloth.
2. Shut down and vent the DSQ II, as described in
"Shutting Down the GC/MS System"
.
3. Remove the right cover, as described in "
Removing the Right Cover" on page 27
.
4. Remove the foreline pressure gauge and foreline adapter.
Figure 51.
Removing the Foreline Pressure Gauge and Foreline Adapter
WARNING - ELECTRICAL SHOCK HAZARD.
Before proceeding. unplug the DSQ II to
avoid an electrical shock.
1
Foreline Adapter Clamp and O-ring 4
Foreline Pressure Gauge Cable
2
Foreline Adapter
5
Foreline Pressure Gauge
3
Foreline Hose Clamp
6
Foreline Tubing
6
1
2
3
4
5
Содержание DSQ II
Страница 1: ...DSQ II Hardware Manual 120299 0002 Revision C December 1 2009 ...
Страница 4: ......
Страница 8: ......
Страница 36: ...1 Basic Operations Shutting Down the GC MS System 20 DSQ II Hardware Manual Thermo Scientific ...
Страница 182: ...4 Vacuum System and Gas Inlets Gas Inlet Components 166 DSQ II Hardware Manual Thermo Scientific ...
Страница 198: ...5 Ion Source and Inlet Valve Inlet Valve Upgrade 182 DSQ II Hardware Manual Thermo Scientific ...
Страница 202: ...6 Prefilter and Quadrupole 186 DSQ II Hardware Manual Thermo Scientific ...
Страница 206: ...7 Ion Detector Electron Multiplier 190 DSQ II Hardware Manual Thermo Scientific ...
Страница 242: ...226 DSQ II Hardware Manual Thermo Scientific Index ...