Dionex Integral Systems Operator’s Manual
86
Doc. 065250-06 03/2020
7.1.3
Connect the Communications Cables
1. Connect the USB cables to the computer and to each Dionex Integral
system component.
2. Connect TTL and relay cables, if used.
7.1.4
Connect the Sample Inlet Line
1. Locate the sample inlet line for each system. If multiple systems are
configured with the analyzer, route a 3-mm (1/8-in) OD line from the
system farthest from the sample source and install a 3-way manifold
from this line at each remaining system.
2. Connect the sample line from the analyzer systems to the SS or
sample source. Refer to the installation requirements document for
correct pressures and flow rates.
3. If an SS is installed, connect it to the sample panel. Refer to the
installation requirements document for correct pressures and flow
rates.
7.2
Initial Startup
7.2.1
Turn On the Power
1. If the Dionex Integral system includes an AE, turn on the main power
switch on top of the AE.
2. Turn on the power switches for the other Dionex Integral system
components (chromatography system modules, SP, and SS).
3. Close the AE door.
4. Twist the knob on the
Emergency Off
switch clockwise to set the
knob to the out position.
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...