Setting Up the Eluent Generator
Doc. 031857-03 4/06
B-37
Items Required to Complete the Setup Procedure
In addition to the EluGen cartridge and the CR-TC, you will need the
following items to complete the eluent generator setup.
Item
P/N
Use To
Yellow 0.5 mL/min, 7 MPa
(1000 psi) backpressure coil
(supplied in the ICS-2000
Ship Kit (P/N 064375))
053765
Provide backpressure during
setup procedures.
EluGen Cartridge Vent Line
Tubing Kit
(supplied with the cartridge)
063092
Vent the cartridge during
operation.
10-32 to 1/4-28 coupler
(supplied in the ICS-2000
Ship Kit)
042806
Temporary connection during
setup procedures.
Temporary waste container
(beaker, bottle, etc.)
(not supplied)
n/a
Collect waste during setup
procedures.
10-32 fittings
10-32 ferrules
043275
043276
Complete the connections
1/8-in fittings
1/8-in ferrules
052267
048949
Complete the connections
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...