ICS-2000 Ion Chromatography System
5-74
Doc. 031857-03 4/06
Filling the EGC CO
3
Mixer with Carbonate Eluent
illustrates the liquid flow path through the eluent generator
components during initial filling of the EGC CO
3
Mixer with carbonate
eluent.
Figure 5-65. Plumbing for Initial Filling of the EGC CO
3
Mixer with Carbonate Eluent
EGC
DEGAS
EGC
IN
Connect to
Gas Separator
Assembly
TO DEGAS
ELUENT OUT
TO SRS/AES
REGEN OUT
WASTE,
GAS
SEPARATOR
Connect to
Suppressor
Regen Out
Pre-plumbed
Pump Pulse
Damper
to
EGC
OUT
TO DEGAS
ELUENT IN
Back-
pressure
Coil
TO INJ
VALVE IN - P/
ELUENT OUT
To waste
EGC CO
Mixer
3
TO EGC CO3
MIXER IN
TO EGC CO3
MIXER OUT
14 MPa (2000 psi)
at 1.0 mL/min
TO PUMP/
DAMPER
To the EluGen
cartridge inlet port
From the EluGen
cartridge outlet port
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...