5 • Service
Doc. 031857-03 4/06
5-69
15. Reconnect the
TO SRS/AES REGEN OUT
line to the suppressor
REGEN
OUT
port.
5.20 Replacing the EGC CO
3
Mixer
5.20.1 Installing the New EGC CO
3
Mixer
1. Turn off the pump from the ICS-2000 Control panel in Chromeleon
or from the touch screen
HOME
page.
2. Disconnect the inlet and outlet lines (labeled
TO EGC CO3 MIXER IN
and
TO EGC CO3 MIXER OUT
) from the existing mixer and pull the
mixer off the mounting clips.
3. Orient the new EGC CO
3
Mixer (P/N 061686)
with the outlet
pointing upward and push it onto the mounting clips (see
). The mixer outlet must point upward to ensure thorough
mixing of the eluent.
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...