ICS-2000 Ion Chromatography System
4-14
Doc. 031857-03 4/06
•
Leaking cell
1. Check the waste lines for blockage; trapped particles can plug the lines
and cause a restriction and/or leak. If necessary, clear the waste lines by
reversing the direction of flow.
2. Make sure the plumbing downstream from the cell is clear; a blockage
may overpressurize the cell, causing it to leak. If the problem continues,
contact Dionex for assistance.
4.3
Pump Difficult to Prime or Loses Prime
Excessive pressure fluctuations (more than 3% difference from one pressure
reading to the next) indicate that the pump is out of prime.
•
Empty eluent reservoir and/or no eluent connected
Fill the reservoir. Make sure all connections are secure.
•
Eluent improperly or insufficiently degassed
Check the vacuum degas settings:
1. Open the Chromeleon Server Configuration program, select the ICS-2000
device icon under the timebase, and select
Edit>Properties
(or double-
click the ICS-2000 device icon).
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...