Dionex ICS-1100 Ion Chromatography System
68
Doc. 065289-03 10/12
4.3
Liquid Leaks
•
Leaking fitting
Locate the source of the leak. Tighten or, if necessary, replace the liquid line
connection (see
Installation of Dionex Liquid Line
Fittings
(Document No. 031432) for tightening requirements. The manual is
included on the Thermo Scientific Reference Library DVD (P/N 053891).
•
Broken liquid line
Replace the line and fittings with the same length and internal diameter tubing
(see
•
Blocked or improperly installed line
Make sure the lines are not crimped or otherwise blocked. Also, if the blocked
line is a waste line, make sure it is not elevated at any point after it exits the
Dionex ICS-1100. If a line is blocked, replace it (see
•
Loose pump check valve
1. Make sure the check valves are firmly seated in the pump head. If they are
not, tighten them carefully with an open-end wrench just until the leak
stops.
2. If the leak persists, replace the check valve (see
•
Leaking seal wash port
Leaking from the seal wash port indicates a leaking piston seal. Replace the
seal (see
•
Damaged pump piston seal
1. Replace the piston seal (see
2. If the leak persists, replace the piston (see
•
Pump head not tight against casting
Carefully tighten the pump head mounting nuts just until the leak stops.
DO
NOT OVERTIGHTEN!
Содержание Dionex ICS-1100
Страница 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Страница 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Страница 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Страница 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Страница 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Страница 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Страница 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Страница 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...