5 • Service
Doc. 155028-01 08/20
81
4. Orient the new seal (P/N 063382) with the grooved side away from the valve,
and slide it over the end of the valve.
5. Insert the valve with the new seal into the pump head opening and turn the
knob clockwise. Tighten finger-tight.
6. Turn on the Dionex Easion power switch.
5.11 Rebuilding the Injection Valve
Thermo Fisher Scientific recommends rebuilding the injection valve annually.
The Injection Valve Rebuild Kit (P/N 075973) contains all the required
replacement parts.
NOTE Substitution of non-Thermo Scientific/Dionex parts may
impair valve performance and void the product
warranty.
1. Click the pump
Off
button on the Chromeleon ePanel.
2. Open the front door of the Dionex Easion.
3. Disconnect each liquid line connected to the injection valve.
4. Follow the instructions provided in the Injection Valve Rebuild Kit to replace
the rotor seal, isolation seal, and stator face.
5. Reconnect all liquid lines to the injection valve.
6. Close the Dionex Easion front door.
7. Click the pump
On
button on the Chromeleon ePanel.
5.12 Replacing the Conductivity Cell
1. Turn off the Dionex Easion power switch.
2. Disconnect the power cord.
3. Open the Dionex Easion front door.
4. Disconnect the black
ELUENT OUT
line from the
ELUENT OUT
port on the
Содержание Dionex Easion
Страница 1: ...Dionex Easion Ion Chromatography System Operator s Manual Document No 155028 Revision 01 August 2020 ...
Страница 34: ...Dionex Easion Operator s Manual 26 Doc 155028 01 08 20 ...
Страница 68: ...Dionex Easion Operator s Manual 60 Doc 155028 01 08 20 ...
Страница 76: ...Dionex Easion Operator s Manual 68 Doc 155028 01 08 20 Figure 5 2 Dionex Easion Flow Schematic ...
Страница 110: ...Dionex Easion Operator s Manual 102 Doc 155028 01 08 20 ...
Страница 118: ...Dionex Easion Operator s Manual 110 Doc 155028 01 08 20 ...