Dionex Easion Operator’s Manual
42
Doc. 155028-01 08/20
4. If the setting is wrong, change the device name.
a.
Select the
Pump_InjectValve
name and press the
F2
key. The
Device Configuration dialog box appears.
b. Select
AS
from the
Controlled By
list.
c.
Click
OK
.
3.11.5 Loading and Injecting Samples with a Syringe
This section describes two methods for loading sample into the injection
valve sample loop with a syringe:
•
Loading sample with a syringe through the sample loading port on the
front of the Dionex Easion (
push
method)
•
Loading sample with a vacuum syringe through the sample loading
port on the front of the Dionex Easion (
pull
method)
NOTE For instructions on how to load and inject
samples with an autosampler, see
Loading Samples with a Syringe (Push Method)
1. Verify that the sample loading port on the front of the Dionex Easion
is connected to sample port
S (5)
2. Fill a syringe with a calibration standard or sample.
3. Insert the syringe into the sample loading port on the front of the
Dionex Easion.
4. Verify that the injection valve is in the Load position. If it is not, click
Load
on the Chromeleon ePanel.
5. Overfill the sample loop with five sample loop volumes. Excess
sample will exit through the injection valve waste line.
NOTE Remember that the line from the syringe to the
valve must be filled before the sample loop can
be filled.
Содержание Dionex Easion
Страница 1: ...Dionex Easion Ion Chromatography System Operator s Manual Document No 155028 Revision 01 August 2020 ...
Страница 34: ...Dionex Easion Operator s Manual 26 Doc 155028 01 08 20 ...
Страница 68: ...Dionex Easion Operator s Manual 60 Doc 155028 01 08 20 ...
Страница 76: ...Dionex Easion Operator s Manual 68 Doc 155028 01 08 20 Figure 5 2 Dionex Easion Flow Schematic ...
Страница 110: ...Dionex Easion Operator s Manual 102 Doc 155028 01 08 20 ...
Страница 118: ...Dionex Easion Operator s Manual 110 Doc 155028 01 08 20 ...