RadEye AB100
DB-070 E
9-1
Pi/Ff 04.05.2021
9. Trouble Shooting
9.1
RadEye AB100 doesn’t power on
9.1.1
Press “On” for at least one second
Keep the button “
” pressed until the LED and the sound is ac-
tive. If the button is pressed only shortly, then the start up routine
is not activated. The LED may flash then only very shortly.
9.1.2
Check battery
If the RadEye does not respond to a long press (> 1s) of the “
”
button, then please use the following step by step procedure:
A) Remove the current batteries
B) Check the battery contacts
C) Check the required orientation of the batteries according to the
printed “+” symbols in the battery compartment.
D) Insert two -“C” batteries with sufficient capacity: Rechargea-
ble batteries should be completely loaded, non rechargeable bat-
teries should supply together at least 2.3 Volt under load.
E) Press the “
” button for more than one second (see also 2.3)
Содержание DB-070 E
Страница 1: ...Operating Instructions DB 070 E RadEye AB100 Multi Purpose Survey Meter ...
Страница 2: ......
Страница 12: ......
Страница 42: ......
Страница 56: ......
Страница 80: ...7 18 DB 070 E RadEye AB100 Pi Ff 04 05 2021 Figure 7 15 Logbook ...
Страница 92: ......
Страница 98: ......
Страница 103: ...RadEye AB100 DB 070 E 11 3 Pi Ff 04 05 2021 ...
Страница 104: ......
Страница 114: ......
Страница 116: ......
Страница 117: ......