MEB Options
General
MEBs may be installed in three locations within the enclosure. They are
stacked in a location using standoffs. Each location has a limit to the
number of MEBs that may be installed. This is illustrated in Figure 4–2.
Figure 4–6 Installation locations for MEBs
4-6 AutoPILOT PRO Flow Computer User Guide
Thermo Fisher Scientific
Содержание AutoPILOT PRO
Страница 3: ......
Страница 5: ...Thermo Fisher Scientific ...
Страница 7: ...Thermo Fisher Scientific ...
Страница 129: ...Specifications B 4 AutoPILOT PRO Flow Computer User Guide Thermo Fisher Scientific ...