Installation and Setup
Setup Procedure
Thermo Scientific
43iQ Instruction Manual
2-7
5.
Plug the instrument into an outlet of the appropriate voltage and
frequency.
Note
If instrument is equipped with an internal permeation oven, refer to
Chapter 9, “
” for setup instructions.
▲
The 43iQ is supplied with a three-wire grounding cord. Under no
circumstances should this grounding system be defeated.
▲
Figure 2–5.
43iQ Rear Panel
Figure 2–6.
Atmospheric Dump Bypass Plumbing
Icon Here
Содержание 43iQ
Страница 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Страница 2: ......
Страница 8: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Страница 162: ......
Страница 166: ...Maintenance Pump Rebuilding 5 4 43iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 170: ......
Страница 180: ......
Страница 188: ...Servicing Fan Replacement 7 8 43iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 228: ......
Страница 238: ......
Страница 262: ......
Страница 270: ......
Страница 282: ......
Страница 283: ......