Servicing
Fuse Replacement
Thermo Scientific
43iQ Instruction Manual
7-5
Use the following procedure to replace the fuses.
4.
Turn instrument OFF and unplug the power cord.
5.
Remove fuse drawer, located on the AC power connector.
6.
If either fuse is blown, replace both fuses.
7.
Insert fuse drawer and reconnect power cord.
Figure 7–4.
Replacing the Fuses
Fuse
Replacement
Содержание 43iQ
Страница 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Страница 2: ......
Страница 8: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Страница 162: ......
Страница 166: ...Maintenance Pump Rebuilding 5 4 43iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 170: ......
Страница 180: ......
Страница 188: ...Servicing Fan Replacement 7 8 43iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 228: ......
Страница 238: ......
Страница 262: ......
Страница 270: ......
Страница 282: ......
Страница 283: ......