Maintenance
Pump Rebuilding
5-2
43iQ Instruction Manual
Thermo Scientific
Use the following procedure to rebuild the pump.
Equipment required:
Pump rebuild kit (qty. 1)
Phillips drive, #1 or Torque drive, T10 (depending on pump version)
Pencil or marker
Figure 5–1.
Single Stage Pump
1.
Turn instrument OFF, unplug the power cord, and remove the cover.
2.
Mark the position of head parts relative to each other by drawing a line
with a pencil. This helps avoid incorrect assembly later.
3.
Undo the four screws in the head.
4.
Lift the head plate and the intermediate plate off the housing.
5.
Hold the pump with one hand, so that the diaphragm is pointing
downwards. Lift the diaphragm by the opposing side edges, grasp it and
unscrew it in the counter-clockwise direction.
Pump Rebuilding
Содержание 43iQ
Страница 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Страница 2: ......
Страница 8: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Страница 162: ......
Страница 166: ...Maintenance Pump Rebuilding 5 4 43iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 170: ......
Страница 180: ......
Страница 188: ...Servicing Fan Replacement 7 8 43iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 228: ......
Страница 238: ......
Страница 262: ......
Страница 270: ......
Страница 282: ......
Страница 283: ......