Using the WinPDM Software
Configuring a Program Shift
Thermo Fisher Scientific
PDM 3600 Instruction Manual
3-13
The Program Shift screen contains the following information:
●
1. Wearer ID.
This field contains the identification number (8 digits)
of the person who is wearing the PDM unit.
●
2. Mine ID.
This field contains the identification number of the mine
where the PDM unit will be used for sampling.
●
3. Contractor Code.
This field contains the contractor code (or
contractor identification number) of the contractor using the PDM
unit for sampling.
●
4. Mine Name.
This field contains the name of the mine where the
PDM unit will be used for sampling.
●
5. Company Name.
This field contains the name of the company using
the PDM unit for sampling.
●
6-7. Sample Start Time.
This field contains the start date and time that
the PDM unit will begin its programmed sample run (first sample).
Note
This must be at least 35 minutes later than current time to
accommodate 35 minute warm-up time. The warm-up time automatically
adjusts when the sample time is set.
▲
●
8. Sample Duration.
This field contains the time duration (hh:mm) of
the sample run.
●
9. Type of Sample (select one).
This field contains the sampling type
of the sampling run. The sampling types are: “designated occ (ug)”,
“nondesignated occ (ug)”, “designated area (ug)”, “designated work
position”, “part 90 miner”, and “engineering evaluation”.
●
10. MMU DA/SA.
This field contains the 4-digit mechanized mining
unit (MMU) identification code and the 4-digit designated
area/designated work position (DA/SA) for the MMU that will be
using the PDM unit.
●
11. Occ Code.
This field contains the 3-digit occupational code of the
operator using the PDM unit.
●
Average Expected Temperature.
This field contains the average
expected temperature of the ambient air where the PDM unit will be
performing its sample run. The temperature ranges are: “-2 to 9
˚
F”,
“10 - 22
˚
F”, “23 - 34
˚
F”, “35 - 47
˚
F”, “48 - 59
˚
F”, “60 – 72
˚
F”,
“73 – 85
˚
F”, “86 – 97
˚
F”, and “98 - 104
˚
F”.
●
Auto Shift Setup.
Check the days of the week for the instrument to
automatically start. Connect the instrument to the charger to recharge
the battery, and the instrument will be ready to use the same time each
consecutive day. Daily cleaning and filter changing must be performed
between shifts.
Содержание 3600 PDM
Страница 1: ...Model 3600 PDM Personal Dust Monitor Part Number 42 009904 8Oct2013...
Страница 16: ......
Страница 34: ...Basic Operation PDM Display 2 10 PDM 3600 Instruction Manual Thermo Fisher Scientific Figure 2 17 PDM display...
Страница 52: ......
Страница 70: ......