Section 5 – SR-2 Diagnostics
38 ELECTRIC PHASE REVERSED
Page 1 of 2
Alarm Type
A Shutdown Alarm if unit is running in electric mode
A Log Alarm if unit is switched from electric mode to diesel mode
Associated Alarm
Codes
Alarm Code 90 Electric Overload
How Alarm is Set
Two phases are reversed on 3 phase standby power or the motor is mis-wired, causing the compressor and
condenser fan to rotate in the wrong direction.
How Alarm is Cleared
This alarm is cleared manually.
Diagnostic Procedure
1. Check motor wiring to be sure phase rotation is correct.
2. Confirm that the 7EC-01 wire is connected to the MCB motor contactor and the 7EB-01 wire is connected to the
MCA motor contactor.
3. Check the voltages at the phase detect module. Battery voltage should be present on the 7EA wire and the 8
wire.
4. Check the standby power voltage at the phase detect module. Standby power should be available at L1, L2
and L3.
5. Confirm that the phase wiring between contactor MCA and MCB is correct.
39 CHECK WATER VALVE CIRCUIT
Page 1 of 1
Alarm Type
Check Alarm
Considerations
Not implemented – future use.
5-46
02 February 2005
Содержание SR-2 SmartReefer2
Страница 4: ......
Страница 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Страница 8: ......
Страница 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Страница 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Страница 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Страница 16: ......
Страница 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Страница 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Страница 50: ......
Страница 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Страница 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Страница 98: ......
Страница 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Страница 182: ......
Страница 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Страница 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Страница 268: ......
Страница 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Страница 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Страница 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Страница 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Страница 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Страница 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Страница 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Страница 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Страница 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Страница 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Страница 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Страница 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Страница 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Страница 408: ......
Страница 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Страница 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Страница 420: ......
Страница 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Страница 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Страница 425: ...8 5...
Страница 426: ...8 6...
Страница 427: ...8 7...
Страница 428: ...8 8...
Страница 429: ...8 9...
Страница 430: ...8 10...
Страница 431: ...8 11...