12
CARE AND MAINTENANCE
11. Damper Door
The damper door in the evaporator air outlet
must move freely with no sticking or binding.
12. Defrost Drains
Check the defrost drain hoses and fittings to
ensure they are open.
13. Trailer Doors
Ensure doors and weather seals are in good
condition, doors latch securely and weather
seals fit tightly.
14. Remote Evaporators (SLXe
SPECTRUM)
• Visually inspect Evaporator(s) for damaged,
loose, or broken parts.
• Check also for refrigerant leaks.
• Check Defrost initiation and termination
(including defrost timer) by activating/
initiating a manual defrost.
15. HSLO Module
For SLXe-300 Whisper Pro Units Only.
• Check that the module is turned on and
communicating.
• It’s a good idea to check at some stage
throughout your journey if the SR-3 unit
automatically switches to “High Speed Lock
Out” in an area designated for this - i.e. PIEK
assigned Zone.
LOADING
GENERAL INFORMATION
1. Inspect the trailer for proper insulation.
2. Ensure all door seals are tightly sealed with
no air leakage.
3. Inspect the trailer inside and out for damaged
or loose doors or skin.
4. On the inside, look for damaged walls or
floor, air ducts and clogged defrost drain
tubes.
5. Pre-cool the trailer as to desired setpoint.
6. Ensure loads are at correct carrying
temperature when you pick them up. Note
any variance.
7. Supervise loading of the product to assure
sufficient air space around and through the
load so as not to restrict air flow.
INSPECTING THE LOAD
Always inspect load prior to departure.
1. Ensure unit is off before opening the trailer
doors. Otherwise refrigerated air is expelled
hot air drawn in. The unit may be run with
the doors open if the trailer is properly
backed into a refrigerated warehouse.
2. Perform final external and internal load
temperature checks. Note any irregularities
on the manifest.
3. Ensure cargo is not blocking the evaporator
inlets and outlets and that ample circulation
space has been provided around the load.
4. Ensure trailer doors are securely locked.
5. Ensure controller setpoint is at the desired
temperature.
6. If the unit was stopped, restart using the
starting procedures outlined in this manual.
7. Repeat the After Start Inspection.
8. Defrost the unit one half-hour after loading
by selecting the Manual Defrost. The Defrost
cycle terminates automatically.
Содержание SLXe SPECTRUM
Страница 2: ...ii...
Страница 4: ......
Страница 24: ......
Страница 46: ...44 AUTOCOLLANTS DE S CURIT ET NUM ROS DE S RIE...
Страница 48: ......
Страница 72: ......
Страница 94: ...92 SICHERHEITSAUFKLEBER UND SERIENNUMMERN...
Страница 96: ......
Страница 118: ...116 ADHESIVOS DE SEGURIDAD Y N MEROS DE SERIE...
Страница 120: ......
Страница 142: ...140 PLAKIETKI OSTRZEGAWCZE I NUMERY SERYJNE...
Страница 144: ......
Страница 166: ...164 VEILIGHEIDSAANDUIDINGEN EN SERIENUMMERS...
Страница 168: ......
Страница 188: ...186 G VENL K IKARTMALARI VE SER NUMARALARI...
Страница 190: ......
Страница 212: ...210 AUTOCOLANTES DE SEGURAN A E N MEROS DE S RIE...
Страница 214: ......
Страница 234: ...232 SIKKERHEDSSKILTE OG SERIENUMRE...
Страница 236: ......
Страница 256: ......
Страница 259: ...257 Thermo King Corporation Thermo King...
Страница 260: ...258 15 Thermo King...
Страница 261: ...259 Thermo King Thermo King 1 2 3 4 5 Thermo King CYCLE SENTRY CYCLE SENTRY CYCLE SENTRY 50...
Страница 262: ...260 Thermo King Service Procedure A26A...
Страница 266: ...264 1 ON 2 I ON I 1 3 On SR 3 CYCLE SENTRY CYCLE SENTRY set point CYCLE SENTRY 1 C 32 C CYCLE SENTRY 1 CYCLE SENTRY...
Страница 267: ...265 CYCLE SENTRY Thermo King CYCLE SENTRY...
Страница 268: ...266 1 2 3 50 50 34 C 4 5 6 7 8 9 41 600 25 75 1 3 7 8...
Страница 269: ...267 10 11 12 13 14 SLXe SPECTRUM 15 HSLO SLXe 300 Whisper Pro SR 3 PIEK 1 2 3 4 5 6 7 1 2 3...
Страница 270: ...268 4 5 6 7 8 1 2 set point 3 4 C set point set point 4 C 15 15 Thermo King 4 Thermo King Thermo King...
Страница 277: ...275 UNECE R10 BEA235 BEA236 BEA237 30 50 SLX SLXe BEN009...
Страница 278: ...276...