
Refrigeration Service Operations
105
Installation
1. Place the evaporator coil in the housing.
2. Install the mounting bolts and tighten.
3. Clean the tubes for soldering.
4. Solder the suction line and drain pan hot gas
line connections to the evaporator coil.
5. Connect the distributor to the expansion valve
assembly.
6. Connect the air switch hoses and install the
high temperature cutout switch and electric
heaters (Model 50).
7. Pressurize the low side and test for leaks. If no
leaks are found, evacuate the unit.
8. Open the refrigeration valves and place the
unit in operation. Install the refrigerant charge
and compressor oil and add as required.
Expansion Valve Assembly
Removal
1. Pump down the low side and equalize pressure
to slightly positive.
2. Remove the feeler bulb from the suction line
clamp. Note the position of the feeler bulb on
the suction line.
3. Unsolder the equalizer line from the
expansion valve.
4. Unsolder the inlet liquid line and the
distributor from the expansion valve.
5. Remove the expansion valve mounting bolt
and remove the expansion valve from the unit.
Installation
1. Install and bolt the expansion valve assembly
in the unit.
2. Solder (95-5 Solder) the inlet liquid line and
the distributor to the expansion valve.
3. Solder (95-5 Solder) the equalizer line to the
expansion valve.
4. Clean the suction line to a bright polished
condition. Install the feeler bulb clamps and
the feeler bulb on the side of the suction line
in its former position. The feeler bulb must
make good contact with the suction line or the
operation will be faulty. Wrap with insulating
tape.
5. Pressurize the low side and test for leaks. If no
leaks are found, evacuate the low side.
6. Open the refrigeration valves and place the
unit in operation.
7. Test the unit to see that the expansion valve is
properly installed.
1.
Suction Line
2.
Capillary Bulb
3.
End View
Figure 63: Location of Expansion Valve Bulb
1.
Top View
Figure 64: Completely Wrap Bulb with Tape
Содержание 919180
Страница 4: ...4...
Страница 10: ...Table of Contents 10...
Страница 32: ...Unit Description 32 Unit Photographs Figure 3 Front View Figure 4 Back View AJA584 AJA585...
Страница 33: ...Unit Description 33 Figure 5 Left Side View Figure 6 Right Side View AJA586 AJA58...
Страница 35: ...Unit Description 35 Figure 8 North American Power Receptacle Box AJA58...
Страница 38: ...Unit Description 38...
Страница 58: ...Electrical Maintenance 58...
Страница 66: ...Engine Maintenance 66 Figure 37 Fuel and Oil System Components...
Страница 84: ...Engine Maintenance 84...
Страница 96: ...Refrigeration Maintenance 96...
Страница 118: ...Hilliard Clutch Maintenance 118...
Страница 136: ...Cycle Diagrams 136...
Страница 140: ...Wiring and Schematic Diagrams Index 140...
Страница 141: ...141 Truck S Model SR 30 Schematic Diagram Page 1 of 2...
Страница 142: ...142 Truck S Model SR 30 Schematic Diagram Page 2 of 2...
Страница 143: ...143 Truck S Model 30 Units with P T Wiring Diagram Page 1 of 2...
Страница 144: ...144 Truck S Model 30 Units with P T Wiring Diagram Page 2 of 2...
Страница 145: ...145 Truck S Model 50 Schematic Diagram Page 1 of 2...
Страница 146: ...146 Truck S Model 50 Schematic Diagram Page 2 of 2...
Страница 147: ...147 Truck S Model 50 Units with P T Wiring Diagram Page 1 of 2...
Страница 148: ...148 Truck S Model 50 Units with P T Wiring Diagram Page 2 of 2...