![Thermo Finnigan LCQ Deca XP Plus Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316055.webp)
Changing API Probe Assemblies
______________________________________________ Installing the APCI Probe Assembly
__________________ LCQ Deca XP Plus Hardware Manual __________________
2-9
9. Connect the high voltage cable to the connector on the APCI probe
assembly. Turn the locking-ring on the cable clockwise to secure the
cable.
10. Connect the vaporizer heater cable to the connector on the front fascia
panel of the MS detector (beneath the APCI probe assembly). Make sure
that the white arrow on the cable is aligned with the white line on the
connector.
11. Push the APCI probe assembly against the spray shield.
12. Secure the APCI flange to the spray shield with the two flange retainer
bolts.
13. Place the electronics service switch in the Operational position.
14. In the Tune Plus window, choose
Setup | Change to APCI
to configure
the XP Plus for APCI operation.
Note. The XP Plus data system contains customized tune files (in the
C:\Xcalibur\methods directory) for a variety of applications, including APCI
high flow and APCI low flow LC/MS experiments. In the Tune Plus
window, choose
File | Open
to display the tune files. Refer to
LCQ Deca XP Plus Getting Started for instructions on tuning and
operating the XP Plus in the APCI mode.
Содержание LCQ Deca XP Plus
Страница 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Страница 46: ......
Страница 56: ......
Страница 70: ......
Страница 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Страница 172: ......
Страница 194: ......
Страница 216: ......