66
Wire Diagram (continued)
J8-8
J8-10
J8-9
J9-4
J9-6
J9-5
Supply Sensor
J8-4
J8-11
J8-5
J9-1
P20-1
P20-5
P20-4
P20-6
54
53
52
51
50
49
Header, Tank, or Outdoor Temperature Sensor* (Optional)
Direct Immersion PN: 101935-01
Mounted PN: 103104-01
DHW Temperature Switch OR Sensor Input (Optional)
Sensor PN: 101935-01
Return Temperature Sensor
J10-2
J10-3
P20-2
P20-3
Time of Day Contact (Optional – Supplied by others)
PCB-04
43
44
J17/W1
P18a-4
P18a-3
P4b-1
J11
P4b-2
J8-3
P5-8
P5-11
47
48
MB
1 A
B
C
Modbus To/From
Energy Management
System (EMS)
Communication
In/Out
Transfers both EMS
and Boiler peer to
peer signals
between boilers
RJ45
A
B
C
MB
2
BACnet MSTP, Metasys
N2 or LonWorks
(When optional Universal
Gateway Installed)
Modbus To Other
Controllers To Be
Monitored
FG
V-
V+
24Vdc
Supply
+
-
Com 2
Concert Display
(B07S515)
-+
24Vdc
P28-6
P28-5
P28-4
P28-7
P28-8
P28-9
P28-1
P28-2
Universal
Gateway
(Optional)
BACnet
PN: 106416-01
Lonworks
PN: 106418-01
Tx/+
Rx/-
GND
3
4
5
6
1
1
2
+ PWR
- PWR
Frame Ground
RS485 +
P28-3
2
RS485 -
3
RS 485 GND
(24Vac +)
J8-1
113
114
P6-4
P5-6
P6-2
P5-7
P5-9
P6-1
P6-3
(24Vac -)
J8-2
PCB-06
P5-10
P5-3
P5-4
P26-6
P26-5
P26-10
P26-9
P26-8
P26-2
P26-3
P26-4
P26-1
P26-7
P26-12
P27-1
P27-2
P27-3
4
9
5
61
62
63
55
56
57
58
59
60
A
B
C
A
B
C
65
66
67
68
69
A+
B-
CG
A+
B-
Cg
64
RJ45
P27-4
P27-5
6
1
Central Heat
Enable/
Disable Input
(STAT)
F2
(3A Slow Blow)
PCB-01
24Vdc Display
Power Supply
PCB-05
N/A
P5-5
N/A
Setpoint or Modulation
4-20mAdc Input
(Supplied by others)
J8-6
P4b-4
45
P18a-2
J8-7
P4b-3
46
P18a-1
P5-2
P5-1
45
46
113
114
C – I+
C – I-
B – 24V
B – 0V
A - V+
A - COM
0-10V
Input
+
-
0-10V to 4-20mA
Signal Converter
(Optional)
PN: 107183-01
+
-
Rate Tracking
0-10Vdc Output
115
116
117
118
J10-6
P5-12
J10-5
P5-14
+
-
Rate Tracking
4-20mAdc Output
J10-4
P5-13
J10-1
Alarm Reset
J2-1
J2-3
J2-2
J2-4
Combustion Blower Comm.
Tach.
DC+
PWM
DC-
J1-4
J1-6
UV Scanner
Blue
White
DB9
Concert Boiler
Control (A1167)
2
2.2
Wiring Legend
Wiring Line Types:
Terminal Types:
Terminals :
C = Common
NC = Normally Closed
NO = Normally Open
Factory Wire Harness – Line Voltage
Factory Wire Harness – Low Voltage
Factory wiring special Igniter
Field Wiring – Line Voltage
Field Wiring – Low Voltage
Male/Female Connector
Screw Terminal
70
PCB Screw Terminal
Annotations:
Optional Part
Field Installed
Ground Screw Terminal
Wire Nut
J8
Uncut Jumper
J8
Cut Jumper
Jumpers Cut:
1, 2, 7, 8, 9, 11
Unused Terminals:
33, 34, 35, 37, 38
Last Terminal:
118
3
2
1
Outdoor
Temperature
Wireless
Input
Wireless Outdoor
Adapter
(Optional)
PN: 105766-01
Wireless
Outdoor
sensor
EC
OM
3
2
1
Stack Sensor
*Terminals 53 and 54 are used for indirect water heating
with an AMP boiler. For an AMP water heater, connect the
tank sensor to 51 and 52.
Continue from high
voltage circuit
24vac
. Electrical
(continued)
Содержание AMP 1000
Страница 13: ...13 IV AMP Component Identification continued Figure 3 Component Identification 26 25 22 18 2 23 27...
Страница 85: ...85 Notes...
Страница 86: ...86 This page is intentionally left blank...