Warranty Information

Stainless Steel Cylinders carry the following guarantees as standard: 

FACTORY WARRANTY

1. The warranty begins on the date of delivery. A dated delivery note will be issued to the customer and a copy will be stored by Thermal
integration.

2. 

1 Year Parts and labour

 - Parts or labour proven to be defective will be replaced / repaired free of charge for a period of 12 months

from date of delivery, provided the cylinder is installed by a qualified engineer within 6 months of date of delivery.

2 Years Parts Only

 - Parts proven to be defective will be supplied free of charge (for fitting by others) for a period of 24 months

from date of delivery.

25 Years on the base unit against leaks

 - Stainless Steel cylinder bodies are guaranteed against perforation / leakage for a period

of 25 years from date of delivery. (Cylinder bosses and welds are excluded from this guarantee)

3. Replacement of parts under warranty does not extend the duration of the warranty

4. Any other costs are not covered by this warranty. All other damages of any nature whatsoever and howsoever arising, are expressly
excluded from this guarantee.

5. 

The warranty conditions above only apply:

a. In the UK only on items provided exclusively by Thermal Integration.
b. If the product is installed by a qualified engineer in compliance with the installation instructions.
c. The installer must complete the commissioning checklist in full at the time the cylinder is installed. The end user must also
complete the relevant sections of this checklist and it must be returned to Thermal Integration within 30 days of commissioning.
Checklists are enclosed in the installation instructions.
d. If the installation complies with all current and relevant building regulations and codes of practice (including the requirement to
clean the primary and secondary heating systems and add corrosion inhibitor in line with BS7593:2006)
e. If the product is used and maintained exclusively according to the manufacturer's instructions with proof that the system has
been protected with a suitable corrosion inhibitor, and all additions of inhibitor are clearly recorder (date and quantity) on the
system, using labels supplied with the inhibitor.
f. If the returned item is accompanied by a fully completed Thermal Integration Warranty Return Form.

6. 

Excluded are defects caused by:

a. Failure to maintain in accordance with manufacturers instructions.
b. Improper use.
c. Any attempt at repairs / maintenance by un-qualified persons.
d. where parts other than Thermal Integration Genuine Parts have been used in any service or repair.
e. Lightning, fire or natural disasters.
f. Deterioration and / or pollution from the heating system or water network, either domestic hot water or heating side.
g. Harmful additives to the heating water.
h. Consumables as specified by us, including but not limited to: hoses, gaskets and batteries.
i. Damage arising from faulty site installation or wiring.

7. Report any faults to your installer, service engineer or Thermal Integration directly. Faulty parts must be accompanied by a fully
completed Thermal Integration Warranty Return form, to be returned to Thermal Integration. Returned items remain the property of
Thermal Integration Ltd.
The Thermal Integration Warranty Return Form can be requested by phone or email. Returns are not accepted unless expressly agreed
in writing.
Transport risk of returned items lies with the sender. The shipping of replacement parts are the responsibility of the supplier.

8. If the cylinder or any component thereof breaks down, we may ask you to pay us a deposit before we repair or replace it. We will
return the deposit in full if we find a fault that is covered by this warranty. We may keep the deposit if we cannot access your property
at the time we had arranged with you to visit or we find other conditions of this warranty have not been met. A responsible adult must
be at the property to give our engineer this access to the cylinder.

Page 15

Содержание Amazon HXINUV

Страница 1: ...Amazon HXINUV Installation Instructions A1 28 06 2019 Amazon HXINUV Installation Instructions A1 ...

Страница 2: ...uctions A1 Wiki Binder 28th June 2019 About Thermal Integration 3 Drawing 4 Overview 5 Operation 6 Plumbing 7 Wiring 8 Commissioning 9 Tables 10 Component Data Sheets 11 General Plumbing Requirements 12 General Wiring Requirements 13 Commissioning Checklist 14 Warranty Information 15 Page 2 ...

Страница 3: ... demonstration and test facility attached to the factory with the factory building services running from a twin pellet biomass boiler installation buffer storage and HIUs to provide services The entire facility is controlled using our in house IHIU Control Systems that allow any of our products to be network connected with online monitoring and dashboard facilities For a complete history of the co...

Страница 4: ...Amazon HXINUV Installation Instructions A1 28th June 2019 Drawing Page 4 ...

Страница 5: ...ary heat source can be utilised as an instantaneous water heater Heat up times are further reduced by feeding the Domestic Hot Water DHW as it is created directly into the top part of the cylinder This enables greater performance to be achieved than standard from a given cylinder capacity alternatively it allows a smaller than standard cylinder to be used where space is restricted The HXINUV will ...

Страница 6: ...t source via the two port energy cut out motorised valve Primary heat from the boiler now flows down through one channel of the plate heat exchanger in counter current cool water from the base of the cylinder and or cold mains water is drawn upwards through the other channel The cool water is heated and DHW passes out and into the top part of the cylinder Heating of the cylinder continues until bo...

Страница 7: ...ut sides of the plate heat exchanger of 50C in a single pass The resultant delta on the primary side can be in the region of 40 45C and flow rates of 15 35 Litres min dependent on the power of the heat source and its flow temperature If the connected plant or heat source cannot operate with these deltas or flow rates suitable bypass and flow regulation equipment must be sourced and fitted by the i...

Страница 8: ...d that the permanent Live Neutral Earth for the boiler and space heating controls if fitted are all taken from the wiring centre in order to balance with the switched live outputs to both the boiler when called and zone control for space heating and provide a single point of isolation for the DHW and CH plan however the installer may choose to derive their own solution in which case it is imperati...

Страница 9: ...er assumes a cold mains water inlet of 10 degrees and a DHW output to the cylinders of 60 degrees NOTE The stated flow rate described in Tables A B is the total flow from the plate heat exchanger into the cylinder In a twin cylinder installation this flow must be divided equally between the two cylinders e g for a 35KW boiler required flow rate is 10 Litres min Therefore each flow setter to be set...

Страница 10: ...e rise Flow rate L min 10 50 2 9 15 50 4 3 20 50 5 7 25 50 7 1 30 50 8 6 35 50 10 40 50 11 4 45 50 12 9 50 50 14 3 TABLE B DHW flow setter values Vs Boiler output 100KW version Boiler output KW Temperature rise Flow rate L min 50 50 14 3 55 50 15 7 60 50 17 1 65 50 18 6 70 50 20 75 50 21 4 80 50 22 9 85 50 24 3 90 50 25 7 95 50 27 1 100 50 28 6 Page 10 ...

Страница 11: ... 2019 Component Data Sheets The following datasheets are sent with the Amazon HXIN Unvented DHW Cylinder and can also be found on our Wiki site http www heatweb co uk w RAVK Data Sheet AVTB Data Sheet Flow Setter Data Sheet Wilo SB30 Bronze Pump Page 11 ...

Страница 12: ...s located The appliance must be installed in accordance with and comply to the current IEE Regulations Building Regulations Building Standards Scotland Consolidation Building Regulations Northern Ireland local water by laws Health Safety Document 635 The Electricity at Work Regulations 1989 and any other local requirements BRITISH IRISH STANDARDS Where no specific instruction is given reference sh...

Страница 13: ...BS7074 1 Code of practice for domestic and hot water supply EN12828 Central heating for domestic premises BS7593 Treatment of water in domestic hot water central heating systems ECTI National rules for electrical installations CAUTION ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS Danger of short circuit When connecting the cables ensure that no cab...

Страница 14: ...8 Curzon Road Sudbury Suffolk CO10 2XW Tel 0845 241 1441 The Installer should fill out the following section before leaving this form with the end user The End User should fill out the following section before returning this form to Thermal Integration Ltd Failure to return this form may jeopardise the warranty on this system Page 14 ...

Страница 15: ...bitor in line with BS7593 2006 e If the product is used and maintained exclusively according to the manufacturer s instructions with proof that the system has been protected with a suitable corrosion inhibitor and all additions of inhibitor are clearly recorder date and quantity on the system using labels supplied with the inhibitor f If the returned item is accompanied by a fully completed Therma...

Отзывы: