CUTMASTER 10MM, 12MM
Manual 0-5197AD 4-3 OPERATION
B. Torch Connection
Check that the torch is properly connected.
C. Check Primary Input Power Source
1. Check the power source for proper input voltage. Make sure the input power source meets the power require-
ments for the unit per Section "2.05
Power Source Specifications" on page 2-2.
2. Connect the input power cable (or CLOSE the main disconnect switch) to supply power to the system.
D. Gas Selection
Ensure gas source meets requirements listed in Section "H. Gas Requirements" on page 2T-1. Check connec-
tions and turn gas supply ON.
E. Connect Work Cable
Clamp the work cable to the workpiece or cutting table. The area must be free from oil, paint and rust. Connect
only to the main part of the workpiece;
do not
connect to the part to be cut off.
Art # A-03387
Figure 4-4 - Work Cable Connection
F. Power ON
Place the Power Source ON/OFF switch to the ON (I) position. Power indicator
turns ON.
Art# A-10225
Air Inlet, 1/4” NPT
On/Off
Switch
Power Cord
Figure 4-5 - Rear Panel with ON/OFF Switch
A
30
20
40
Art# A-10219
Power indicator
Figure 4-6 - Front Panel with Power ON/OFF Indicator
Содержание 1-4200-6
Страница 6: ...This Page Intentionally Blank ...
Страница 12: ...CUTMASTER 10MM 12MM GENERAL INFORMATION 1 6 Manual 0 5197AD This Page Intentionally Blank ...
Страница 18: ...CUTMASTER 10MM 12MM SYSTEM INTRODUCTION 2 6 Manual 0 5197AD This Page Intentionally Blank ...
Страница 30: ...CUTMASTER 10MM 12MM OPERATION 4 8 Manual 0 5197AD This Page Intentionally Blank ...
Страница 36: ...CUTMASTER 10MM 12MM SERVICE SYSTEM 5 6 Manual 0 5197AD This page left blank intentionally ...