91
SHB MPE850 Rev F | 408014 | 408090 | 408101 | 408246 |
1
2
3
4
8 Service tasks in the workshop
8.13 Storing engine and returning to operation
►
Close the hose clamp
2
.
Tightening torque:
3 Nm +0,5 Nm [2.2 lbf ft +0.4 lbf ft]
►
Insert the plug
1
.
►
Mount the drainage hose
4
on the hose
clip
3
.
►
Turn on the ignition, wait a moment and then
turn the ignition off.
►
Repeat the procedure twice.
The fuel system is filled.
8.13.2 Returning engine to operation after storage
Содержание MPE 850 MARINE
Страница 2: ......