BHT-212-MM-1
5-00-00
Page 26
Rev. 14
26 JUN 2013
Export Classification C, ECCN EAR99
4.
Proper oil level.
Chapter 71
RIGHT POWER SECTION
— Detailed Visual Inspection
1.
Gas generator case for cracks buckled areas, and hot spots.
2.
Oil and fuel hoses and tubes for chafing, leaking, and
security.
3.
Electrical wiring for fraying, chafing, and security.
4.
Proper oil level.
Chapter 71
REDUCTION GEARBOX
— Detailed Visual Inspection
1.
Hoses and lines for security, leaks, and chafing.
2.
Oil filter impending bypass indicator button not extended.
3.
Proper oil level.
Chapter 71
ENGINE AND REDUCTION GEARBOX MOUNTS
— Detailed Visual Inspection
1.
Mounts for loose bearings and security.
ENGINE FIREWALLS
— Detailed Visual Inspection
1.
Firewalls for cracks, distortion, missing rivets, broken spot
welds, and deteriorating seals or gaskets.
SCHEDULED INSPECTIONS
5-8.
DAILY INSPECTION — PART A (CONT)
DATA
REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Содержание Bell 212
Страница 6: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 27: ......
Страница 35: ......
Страница 75: ......
Страница 83: ......
Страница 121: ......
Страница 141: ......
Страница 153: ......
Страница 155: ......
Страница 159: ......
Страница 163: ......
Страница 165: ......
Страница 167: ......
Страница 169: ......
Страница 171: ......
Страница 173: ......
Страница 175: ......
Страница 177: ......
Страница 179: ......
Страница 183: ......
Страница 187: ......
Страница 189: ......
Страница 191: ......
Страница 193: ......
Страница 199: ......
Страница 201: ......
Страница 207: ......
Страница 209: ......
Страница 211: ......
Страница 215: ......
Страница 223: ......
Страница 225: ......
Страница 231: ......
Страница 243: ......
Страница 253: ......
Страница 261: ......