4-2-3. Configuration
Description
When using the multiple units in parallel all the basic settings
are adopted from the master unit.
Operation
(1/2)
1.
Make sure all load units are turned off.
2.
Make sure the power source is turned off.
3.
Connect the load units to the power source.
Ensure the wire gauge is sufficient to handle the increase
in current.
4.
Connect the Master unit to the slave units via the J1 and
J2 connectors*.
Use the GTL-255 frame link cables Connect from:
M:J2
⇔
S1/B1:J1, S1/B1:J2
⇔
S2/B2:J1, S2/B2:J2
・・・
(M: Master, S: Slave, B: Booster, GTL-255:
⇔
)
Remove one ferrite core from the last frame link cable.
Remove the ferrite core that is closest to the J1
connector on the last slave unit or booster. See (page
148) the diagram below for details.
5.
Turn the load units on.
6.
On the designated master unit, press
Main
>
Configure
[F5] >
Next Menu
[F4] >
Parallel
[F1] in order
.
7.
Set the unit
to
Master
with the
Operation
setting.
8.
Assign the number of attached slave units or booster
units with the
Parallel
and
Booster
settings.
When connect the same model to parallel, set number by
Parallel
setting. A maximum of 5 units can be used in
parallel.
When connect LSG-1050H and LSG-2100SH to parallel,
set number by
Booster
setting.
A maximum of 4 boosters can be used with a single,
acting as a master unit.
External
Previous
Menu
Booster
OFF
LOAD
RS232
01/Oct/2017
Parallel
Operation
3
Master
Configure
A Value
Fine
CV
8.75A
80V
Fast
Knob
Parallel
Содержание LSG-1050H
Страница 24: ...14 GRA 414 E EIA standard 132 382 5 477 6 GRA 414 J JIS standard 149 382 5 477 6...
Страница 185: ...175 7 6 Operating Area 7 6 1 LSG 175H H Range M Range L Range...
Страница 186: ...176 7 6 2 LSG 350H H Range M Range L Range...
Страница 187: ...177 7 6 3 LSG 1050H H Range M Range L Range...
Страница 188: ...178 7 6 4 LSG 2100H H Range M Range L Range...
Страница 204: ......