7
1-7. Power Up
Power up steps
1.
Connect the power cord to the
AC Voltage input.
Note
Make sure the ground connector of the power cord is connected to a
safety ground. This will affect the measurement accuracy.
2.
Push to turn On the main
power switch on the front
panel.
3.
The display shows the model name and the version for a few seconds.
Example: DL-2052, V1.00
4.
Followed by the default measurement settings.
5.
And the interface I/O settings.
6.
Then the default setting appears.
Example: DCV, Auto, 1V range
Содержание DL-2052
Страница 1: ...B71 0422 01 INSTRUCTION MANUAL DIGITALMULTIMETER DL 2052 ...
Страница 55: ...48 8 3 Status system ...
Страница 60: ...53 9 13 External Dimensions Figure ...